Crawler DTH Drilling Rig
DTH drilling can be performed in almost any rock drill-ability category. It is a common drilling equipment in the natural gas extraction, mineral extraction,drilling water wells, construction, creating oil wells. DTH drilling rigs can be equipped with diesel or electric motors according to different working conditions. During the rock drilling process, the impactor sneaks into the borehole, which can reduce the energy loss caused by the impact of the drill rod, thereby reducing the influence of the drilling depth on the borehole.
| YGS150 | YGS100A | YGS153 | YGS180 | YGS300 | YGS350 |
| Total Weight | 5.95T | 3.8T | 6.3T | 6.8T | 8T |
| Walking speed | 2.5km/h | 2.5km/h | 2.5km/h | 2.2/3.8km/h | 4km/h 2km/h |
| Diesel tank capacity | 85L | 70L | 85L | 85L | 225L |
| Shipping size | 6500*2110*2400 mm | 4640*1980*2260 mm | 6600*2110*2500 mm | 6600*2220*2600 mm | 7600*2350*2800 mm |
| Drilling hole diameter | 90-146mm | 83-130mm | 90-146mm | 90-152mm | 90-165mm |
| Power configuration | YCD4R22T-80 | YC2108 33kw/2400rpm | YCD4R22T-80 55kw | YC4DK80-T302 | YC4DK100-T304 73.5kw/2200rpm |
| Highest horizontal hole height | 3.2m | 2.8m | 3.6m | 3.25m | 3.5m |
Feature
1. Has free relaxed fluctuation system, hydraulic lifting device casing.
2. Large working range, strong terrain adaptability, and high efficiency.
3. The side swing mechanism is adopted to realize all-round drilling.
4. The frame part is made of high-strength steel, the overall structure is strong and durable.
5. The tubing drag chain can avoid the friction between the tubing and the guide rail, protect the tubing and increase the service life.
6. The power head part can adjust the rotation speed according to the softness of the rock layer, achieve a smooth high torque output.
Working Site
We believes that good quality can give us survival, thus we only provide you top products. All the products with high quality meet international standards and are highly estimated by all clients at home and abroad.
All the staff in
1. Packaging: 1)Wrapped by protective film
2)Packed by standard import & export wooden cases or carton boxes.
2. Shipping
By logistics; by automobile; by train; by shipping; by air etc.



-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
7 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.