Product details
No Pit Required Flat Floor Install. Save 3000 to 8000 USD in civil works. No excavation. Setup 3 days. Works in rented factory. Competitors need 1 to 2m pit 4 to 6 weeks. Q3730 runs on flat floor Day 1.
Sa2.5 Near-White Blast Cleaning Every Hook. 500 to 5000kg per hook. 15sqm per hour. 120 to 200kg per min shot flow. 4 to 8 wheels 360 degree zero blind zones. 10 to 15 min cycle. Pre-shipment full-load test signed Sa2.5 report per ISO 8501-1.
360 Degree Coverage Zero Blind Zones. Blast wheels top bottom plus and minus 45 degree. All surfaces in one pass flanges web fillets underside. No rework. No reblast. Processes castings forgings steel structure gearbox brake disc pump valve mining railway.
Fortune 500 Verified Same Standard Every Order. CE Intertek EU Machinery Directive 2006/42/EC product-specific. ISO 9001-2015 certified. OSHA-compliant chamber dust below 10 mg per cubic meter exceeding EU 98/24/EC by 3 times. CE file included.
Mn13 Liner Plates self-harden 200HB to 550HB under impact. Cr20 blasting wheel blades 800 to 1200 hours. 5-stage abrasive recovery separator elevator sieve air-wash screw conveyor cuts consumption 30 percent. Cartridge dust collector 99.5 percent filtration.
Siemens S7-1200 PLC HMI Touchscreen English Spanish Arabic. Recipe memory per part one-touch changeover. Auto hook load and unload available. Real-time monitoring wheel amperage abrasive level dust pressure. OPC-UA export for MES and ERP. Hook quantity 1 or 2.
Custom Engineered Free Proposal within 2 Hours. Hook qty 1 or 2. Voltage 380V 415V 220V 460V 50Hz or 60Hz. PLC Siemens or Mitsubishi. Chamber per workpiece. Wheel count 4 to 8. Send drawing or sample. 12 engineers deliver proposal with 3D layout in 2 hours.
Botou Hebei Shot Blasting Machinery Capital. 100 percent local supply chain Mn13 steel Cr20 wheels Siemens PLC. Lead time 25 to 35 days versus 60 to 90 standard. 11 Years Export 30 Plus Countries 3900 Sets Fortune 500 Trusted




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
15 days
-
Step 3
Packaging and dispatch
Ocean freight via Maersk · Approx. shipping fee: $ 0.84 for 1 unit · Transit time: Est. 17-24 days
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.