Skip to Content

Browse

Oil Field Equipment

Lead time 30 days

Truck Mounted XJ550 /Drilling&Workover Rig

MOQ: 1 Units
357,520.00
Lead time 23 days

Rotary Drilling Rig

MOQ: 1 Units
27,810.00
Lead time 90 days

Shengji Group Automatic Work Over Rig Major Minor Oil and Gas Well

MOQ: 1 Units
57,220.00
Lead time 2 days Shipping 21–62 days

Tiger Rig Manufacture Long Work Wife XJ900 Onshore Workover Rig

MOQ: 1 Units
14,150,260.00
Lead time 120 days

Oil and Gas Drilling Rig 2000m~7500m

MOQ: 1 Units
2,860,020.00
Lead time 10 days

2000HP Drilling Truck Rig for Oil Filed

MOQ: 1 Units
715,020.00
Lead time 15 days

Oil Rig Drilling Rig Equipment YZ08 Rig Motor.

MOQ: 1 Units
77,240.00
Lead time 30 days

Truck Mounted XJ550 /Drilling&Workover Rig

MOQ: 1 Units
357,520.00