Skip to Content

Browse

Dredger

Certifications ISO9001:2008 · CE Lead time 60 days

Durable Jet Suction Cutter Suction Dredger Diesel Powered 300m/h Capacity for Construction Use-Low Maintenance Cost Long

MOQ: 1 Units
511,030.00
Certifications ISO9001 · CE(3) Lead time 75 days

Supplier Cutter Suction Dredger Sand Pumping Dredge River &lake Dredging Machine for Mining with Pumps

MOQ: 1 Units
96,750.00
Lead time 7 days Shipping 4–37 days

Mini Design Electric Submersible Cable Dredge Pump with Engine 500m/h Capacity for Sand Dredging

MOQ: 1 Units
56,080.00
Lead time 30 days Shipping 7–66 days

Factory Price Cable Submersible Sand Pump Dredger | Submersible Sand Dredge Pump Supplier

MOQ: 1 Units
56,080.00
Certifications ISO9001:2008 · CE Lead time 60 days

Sand Dredging & Gold Mining Jet Cutter Suction Dredger Machine Diesel Powered 500m/h Capacity 15m Dredging Depth

MOQ: 1 Units
429,020.00
Lead time 30 days Shipping 7–66 days

Heavy Duty Cable Dredge Equipped with Submersible Slurry Pump for Mud Extraction

MOQ: 1 Units
56,080.00
Lead time 30 days Shipping 0–2 days

Cable Submersible Sand Pump Dredger | Electric Submersible Dredging Pump for River Sand Mining

MOQ: 1 Units
49,200.00
Certifications ISO9001 · CE Lead time 15 days

High-Pressure Jet Assist Cutter Suction Dredger, Improves Cutting Efficiency in Compacted Soil Conditions

MOQ: 1 Units
77,040.00
Certifications ISO9001 · CE Lead time 31 days

Professional Jet Suction Dredger for Sand Dredging Placer Gold and Channel Maintenance

MOQ: 1 Units
29,920.00
Lead time 7 days Shipping 4–37 days

Submersible Electric Engine Sand Dredger Pump with Pontoon for Cable Dredge Operations

MOQ: 1 Units
56,080.00
Lead time 7 days Shipping 4–37 days

Submersible Electric Sand Pump Floating Dredger with Engine and Agitator 500m/h Capacity

MOQ: 1 Units
56,080.00
Certifications CE(3) Lead time 29 days Orders 1 sold

6/8/10/12/18/20/22 Inch Jet Suction Dredger Machine Sand Dredging Sand Extraction Machine From River

MOQ: 1 Units
12,830.00
Certifications ISO9001 · CE Lead time 31 days

Industrial Jet Suction Dredger for River Cleaning Sand Pumping and Gold Extraction

MOQ: 1 Units
29,920.00