Custom Manufacture Heavy Duty Metal Floating Wall Shelves Support Shelf Bracket
| Product | Shelf Bracket |
| Material | Stainless Steel, Carbon Steel(Q235), Aluminum(6061,6063, 5052), Copper, Brass and So on |
| Process | Bending, Stamping, Welding |
| Finish | Zinc Plating, Mirror Polished, Brush Polished, Paint, Anodic Metal Bracket Set Factory OEM Brackets For Cable TrayOxidation, Powder Coated |
| Package | Plywood Box + Plywood Pallet, Plywood Box |
| OEM Service | Accept |
Our professional workshop making various kinds of metal stamping parts, such as metal fabrication parts, metal deep drawing parts, metal bending parts, metal welding parts, etc.
OEM/ODM service is welcome.
1. Don’t accept defective, strict inspection of raw materials.
2. Don’t manufacture defective, the production process is strictly controlled. For all products, the workers are strictly self-inspected on each machining process, and the quality inspectors do a regular inspection and spot inspection.
3. Don’t transferring defective, the defective products found in the previous process shall never be allowed to be transferred to the next process. Before shipment, the finished products shall be inspected again, and if any quality problems are found, and the products shall be reworked or rejected according to the relevant requirement.
If you want to get more, please visit the following Video.
1. What are your main products? We specialize in manufacturing metal stamping die, metal stamping parts, sheet metal parts, CNC machining part and welding structural parts etc.
2. What is surface treatment do you have? Powder coating, zinc plating, polished, paint, anodic oxidation etc.
3. Can I get the samples?
Yes, the sample is free, you only need to bear express shipping freight or we can send the sample to you by your collect account.
4. What is the MOQ? The MOQ is 500pcs for large parts, 1000pcs for small parts.
5. What’s the delivery time? Normally, it will take about 20- 25 days to finish one order.
6. What’s your payment term? 30% down payment, 70% before shipment
7. Do you receive OEM/ODM? Yes, we have more than 9years OEM experience.
Thank you for your interest in Industrial.
Don’t see what you’re looking for on our
Just ask and we’ll do everything we can to get you what you want. You can get a reply within 60 minutes.





-
Step 1
Payment and order readiness
Minimum order: 100 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
Lead time will be confirmed with your quotation.
-
Step 3
Packaging and dispatch
Ocean freight via Maersk · Approx. shipping fee: $ 0.84 for 1 unit · Transit time: Est. 17-24 days
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.