| Description: Medium Crown Stapler ( Gauge 16), Air Stapler Gun Model Number: GDY-N851A Staples size: Ga.16 1.6X1.4mm, Crown 10.8mm, Length 18-50mm Place of Origin: Zhejiang, Dimension(mm): 95x 290x 350 Working Pressure: 120psi(8.3bar) Air Inlet: 1/4''''Npt Weight: 2.75kgs Packaging Details: Color BOX | |
| Description | Medium Crown Stapler ( Gauge 16), Air Stapler Gun |
| Model Number | GDY-N851A |
| Staples size | Ga.16 1.6X1.4mm, Crown 10.8mm, Length 18-50mm |
| Place of Origin | Zhejiang |
| Dimension(mm) | 95x 290x 350 |
| Working Pressure | 120psi(8.3bar) |
| Air Inlet | 1/4''''Npt |
| Weight | 2.75kgs |
| Packaging Details | Color BOX |
| Description | Medium Crown Stapler ( Gauge 16), Air Stapler Gun |
| Model Number | GDY-N851A |
| Staples size | Ga.16 1.6X1.4mm, Crown 10.8mm, Length 18-50mm |
| Place of Origin | Zhejiang |
| Dimension(mm) | 95x 290x 350 |
| Working Pressure | 120psi(8.3bar) |
| Air Inlet | 1/4''''Npt |
| Weight | 2.75kgs |
| Packaging Details | Color BOX |
Main Features
1) Die cast aluminum housing for durability,large piston for increased power
2) Features touch-strike safety system
3) One-piece hardened alloy steel driver for longer tool life
4) Special-design quick strain release latch for easy and fast loading of staples
5) Conbination trigger with lock
6) applications for furniture frame assembly,pallet and crate assembly,floorings,door&window framing,wall&roof sheathing
Answer: We are a professional factory to produce Nailers and staplers over 20 years experience.
Answer: We will reply you in 1 hour in the working time. All messages will be replied whenever it comes.
Answer: Nailers and staplers 30,000pcs per month.
Answer: Please
Answer: Yes. We can supply service parts within one year.
Answer: One year.
Answer: T/T 30% Deposit, Balance against with Copy Bill,LC At sight, West union, ESCROW.
Answer: We have our own QC department in
Answer: Yes, of course. We have over 20 years OEM experience.
Answer: Send me details about what you need, you will make the best price and quality.
Answer: Yes. Of course.




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
8 days
-
Step 3
Packaging and dispatch
Economy · Estimated delivery: Oct 2–Oct 26 (23–47 days)
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.