Ratings
| Rated Power | kVA | 375 |
| kW | 300 | |
| Voltage type | 50Hz, 380/220V, 3 phases and 4 wires |
*Ratings at 0.8 power factor
Performance Data
| Engine Brand & Model | HGKT19 |
| Alternator Brand & Model | LSA47.2VS2/300KW |
| Control System | Deepsea DSE6120 |
| Standard Noise Level@7m (Soundproof Sets) | 75 dBA |
| Circuit Breaker Type | 3 Poles MCCB |
| Frequency & Phase | 50hz 3Phases + 4Wires |
| Engine Speed (RPM) | 1500 |
| Fuel Consumption (Nm 3 /hr) 100% Load | 86.19 |
* The above fuel consumption is calculate with the natural gas whose heat value is 35.8MJ/Nm 3
Dimensions and Weights
| Content | Open type | Soundproof Sets | |
| Dimensions: (mm) | L | 3500 | 5600 |
| W | 1250 | 2000 | |
| H | 2020 | 2500 | |
| Weights (kg) | 3380 | 4985 |
Engine Brand & Model: HGKT19
Engine Data
| No. of Cylinders | 6 in-line | Engine power(KW) | 341 |
| Cycle | 4 Stroke | Cylinder Type | Wet |
| Bore * Stroke (mm) | 159 * 159 | Compression Ratio | 11.5:1 |
| Induction | Turbocharged & Aftercooled | Displacement (L) | 18.9 |
| Cooling Method | Water cooled | Governing Type | Electronic |
| Starting method | 24V DC motor | Coolant capacity, including radiator (L) | 115 |
| Lubricant Oil | 15W40-CF4 or above grade | Oil pan capacity (L) | 87 |
How to acquire oil samples
Hot oil or components can cause injury. Don’t let the heat oil or components contact skin. This operation shall be done by trained person.
Get sample by installing a sampling valve. If no sampling valve, please use a vacuum pump along with a long hose. Remove the engine dipstick and insert hose into pipe of dipstick.
In order to ensure the representative of sample, the sample should be taken when the engine stops after a period of normal running.
In order to prevent samples being contaminated, the insurance used should be made clean.
How to replace air filter core
Air filter cores contain a paper core which can not be cleaned by water. Change it according to the following steps: Loose clip, take off the cover(A1), remove the filter(A2) and discard it; Thoroughly clean the inter shell(A3), replace it with new filter, then tighten the cover; Resetting limit indicator.

-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
90 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.