Product details
Core Product Advantage: This bearing is a direct-fit replacement component for the Sandvik HLX 5T drifter, carrying part number 15269308. Manufactured to match the original dimensional tolerances and load specifications of the Sandvik drifter assembly, it restores full operational capability with a precise fit that minimizes downtime on mining and construction drilling sites.
Practical Function Design: The bearing serves as a critical rotating and load-bearing element within the hydraulic rock drill drifter, supporting the drill steel and piston movement under high-impact percussive cycles. Its internally threaded profile and precision-machined bore ensure smooth rotation, stable alignment, and effective absorption of radial and axial forces during continuous borehole drilling operations.
Material And Specification Details: Manufactured from copper alloy with a precision CNC-machined finish, the bearing offers reliable wear resistance and good thermal conductivity under demanding drilling conditions. The cylindrical sleeve design features an internally threaded bore to match the Sandvik HLX 5T drifter assembly. Part number: 15269308. Compatible drifter model: HLX 5T. Reference drawing: Drifter 550 107 38. Exact dimensions are available upon inquiry.
Application Scenarios: Designed for replacement and maintenance use in underground mining, open-pit quarry operations, tunneling projects, and construction foundation drilling. Suited for fleet maintenance teams, mining equipment distributors, spare parts importers, and drilling contractors who require reliable aftermarket components to keep Sandvik HLX 5T rock drill equipment running at full capacity.
Packaging And Supply Support: Each bearing is individually packaged for protection during shipping. Bulk orders are accommodated with competitive lead times. OEM and ODM customization services are available for buyers requiring tailored specifications or alternative alloy grades.



-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
7 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.