United States
·
The buyer was very satisfied with the product and left a 5-star review.
1. What is your MOQ?
Our MOQ is usually 5 CTNS.
2. What is your delivery time? Our delivery is about 30-45 days.
3. What are your payment terms? We accept T/T, 100% L/C, West Union, and so on.
4. Could you provide free samples? Usually, we offer free samples, customers bear the freight cost.
5.
Secondly, We 100% test working pressure for ALL our products, and we inspect 5 times every order. 1) Inspect when the ball valves come out from the injection molding machine 2) Inspect when adding O-rings 3) Inspect when installing handle caps
4) Inspect after working pressure test 5) Inspect before packing
Finally, After-Services will be highly satisfied. Any problems and feedback will tto efficiently.






Minimum order: 100 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
40 days
Ocean freight via Maersk · Approx. shipping fee: $ 0.84 for 1 unit · Transit time: Est. 17-24 days
Final packing, freight, and delivery dates are confirmed before dispatch.
United States
·
The buyer was very satisfied with the product and left a 5-star review.
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.