Brief Introduction
Sucker Rod Pump Unit is one kind of convention beamp pumping unit,which selects the crank balanced is the most common, an application scope broadest surface power equipment in field production oil.
The products conform to API Spec 11E "Specification for Pumping Units" and other related standards,and have obtained the certificate of authority to use the official API monogram.
API B Series Sucker Rod Pump Unit
Drawing
API C Series Sucker Rod Pump Unit Drawing
| 1.Wireline | 2.Polished Rod Hanger | 3.Polished Rod Clamp | 4.Mulehead |
| 5.Walking Beam | 6.Sampon post support leg | 7.Saddle Bearing Assembly | 8.Equalizer Bearing Assembly |
| 9.Equalizer Beam | 10.Pitman Arm | 11.Crank Assembly | 12.Crank |
| 13.Reducer | 14.Brake Assembly | 15.,Motor Base | 16.Main Frame |
| 17.Cross Bars Assembly | Crank Guard,Belt Cover |
C Series Pumping Unit
B Series and C Series Sucker Rod Pump Unit Drawing Comparison
Technical Parameters
API C Series Sucker Rod Pump Unit Technical Parameters
Want to know more, please contact Lillian.
| Packaging | |
| Name | Parts/Tools/Files |
| Method | Iron BOx |
| Packaging Details | Pumping Unit small parts,tools and files(Operation Manual,Parts Catalog) in to the Iron box,then with the Main Machine in to the container |
| Packaging | |
| Name | Main Machine |
| Method | Naked |
| Packaging Details | After fixed, pumping unit main machine naked into the container. |
Parts,Tools, Files
Fixed
Fixed and ready to delivery
Loading
Crane to assist in loading
Loading Finished
All the part into the container
Domestic Transport
Container is transported to the port.
Sea Shippinig
Container loaded on board, travel across the sea to the port of destination.
The number of containers required fot the pumping Machine shipment depends on the model.
International Trade Service Team
B Series Sucker Rod Pump Unit
Mud Pump
Rotary Table




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
35 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.