Cutting Table
Code
RC4025
Structure
Bridge
X and Y Axis Beam
Material: Ductile Cast Iron (S.G.Iron) Process: Extra High Accuracy Calibration
Accuracy
Cutting: ±0.1mm
Repeat Positioning: ±0.05mm
Lead Rail
Oil-immersed, Ball-screw and linear guide
Loading Dimension
4000mm (X-Axis) ✖ 2500mm (Y-Axis)
Turning Table
Optional
Cutting Head
Name
AC 5-Axis
Cutting Stroke
X-Axis: 3600mm
Y-Axis: 2300mm
Z-Axis: 60~80mm
Rotation Range
A-Axis: ±75°
C-Axis: Unlimited
Level Checking
Laser Level Checking
Intensifier Unit
Main Motor Power
37kW
Maximum Pressure
450 mPa (65 kpsi)
Regular Operating Pressure
350~380 mPa
Power Supply
380V 50Hz / customized
Accumulator
Some Parts
UI Monitor
Reminding daily maintenance, error alarm, self-diagnosis function available
CNC Main Controller
Monitor Size
19" / 19 inches
Controll System
WeiHong
Drawing Format
Front Panel
USB port, pressure monitor etc.
TCP/IP Function
Available
Servo Motor
WeiHong or Customized
Auto Alarming
Arasive Feeding System
Abrasive Storage
Maximum: 200 Kg
Cutting Head Supported
Maximum: 2
Company Profile
is a professional waterjet machinery manufacturer.
With our own R&D team, RICH has a strong supply ability for accessories, full-set machine after-sales service and highly customized machinery.
RICH products are not only leading in domestic sales, and also exported to many countries and regions such as:, America, Europe, Middle East
Southeast Asia.
Product Specification
Material: Ductile Cast Iron (S.G.Iron)
Process: Extra High Accuracy Calibration
Packaging and Delivery
Professional Packaging For Overseas Delivery
As a waterjet machinery manufacturer we delivery over 100 sets to overseas market each year. Accumulated packaging and loading experience allows us to provide perfect protection to our machine. Minimizing the transporation risk is our goal. RICH Waterjet focus on stability and water jet cutting machine value.
-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
45 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.