Certificate ASME & CE is Available
Type
Capacity
Material
Control type
XZDHC-150
3000kg/h
SUS 304
automatic
XZDHC-200
5000kg/h
Product Description
High Productivity Hydro Cutter
Hydro cutter is composed of feed pump, feed pipe and knife block, can cut materials into strips, sheets, wedges or other possible shapes, with fast cutting speed, low material loss, easy switching of knife block, simple operation, flexible line, and can be used for long-distance pipeline transportation, while soaking and cleaning materials.
Depending on the model, the production capacity varies from 3-10 tons per hour.
Regular model
The Model showed on the following table is our regular machine.
We also support machine customization service.
Customer Site
Application scope
Widely used in French fries, potato wedges, frozen fruits and vegetables, beverages and other food processing industry.
Processing materials include tubers, vegetables and fruits, especially suitable for potatoes, carrots, onions, radishes, eggplants, green peppers, etc.
Our Advantages
1.
We apply high quality blade, making sure its cutting quality, even width, smooth, no feathering problem.
2.Many shapes available to meet custom needs.
3.High cutting speed,up to 10tons/h.
4.Low cutting loss and high production yield.
5.Easy maintenance,simple and quick cutting head replacement.
6.All stainless steel structure,long time wearing life time.
7.We have capacity from 3000kg-10000kg/h for option, meeting different users' need.
8.High quality:our equipment and process reachEurope standard.
9.Highly automation:our equipment is fully automatically controlled. Saving manual cost.
enjoys the advantages of high automation,simple operation.
We support customization.
Dimension:14000*1500*3000mm,dimension could be customized according to actual situation.
Company Profile
Welcome to visit our company at any time and thanks for visiting our
Sincerely Looking for Partner Agents!
Our Production Site
Packing & Delivery
We usually pack our products by standard export cartons as master carton. We always choose the best and safe packaging material to make sure your orders won't be damaged during delivery.
FAQ
Payment Terms
T/T, L/C and trade assurance are acceptable, T/T will be more appreciated, 30% deposit before
production, 70% balance before shipment.
Delivery time
At least 30 days after the deposit.
Package
Standard packaging
Installation
Our engineer will go to customers site if you need, installation fee should be paid according to the contract.
Warranty
One year warranty period and lifetime service.
Pease
We are looking for sale agent overseas! If you are interested in our product and sales agent,feel free to
-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
Lead time will be confirmed with your quotation.
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.