ZQ drill pipe power tong is an ideal well head tool for oil drilling apparatus, widely applied in making-up and breaking-out in drilling well and repairing well on offshore and land, open head design of the ZQ-series allows to take the long away from drillingpipe freely and high mobility, the tong is a combination of spinning tong and torque tong instead of manual tong and spinning rope for making-up and breaking-out.The Tongs are designed and manufactured according to SY/T5074 standard and API Spec 7K“Specification for Drilling and Well Servicing Equipment”.
Q1. How to get an accurate quotation?
A1: The customer should provide the related technical requirements, drawings, pictures,industrialvoltage, planned output, and our engineers will provide solutions and quotations in time.
Q2. How about your delivery time?
A2: Generally, it will take 35 working days after receiving your deposit payment. The specific deliverytime depends on the items and the quantity of your order, Sometimes we have standard machines instock.
Q3. What is the warrantee period of the machine? A3: We can supply 1 year warranty for our machines, We can provide internet or calling service at anytime. We can also send engineers to your place if the production has big quality problems.
Q4. after-sales service
A4: 1. Installation: Free installation and commissioning, travel expense is on foreign(Including round ticket and accommodation cost) customer 2. Personnel training: Our engineers will give your employees free machine training when they cometo your company to assemble the machines, and welcome to
A5: Accepted Delivery Terms: FOB, CFR, CIF, EXW,FAS, CIP, FCA, CPT, DEQ, DDP, DDU, Express Delivery,DAF, DES; Accepted Payment Currency: USD, EUR, JPY, CAD, AUD, HKD, GBP, CNY,CHF;Accepted Payment Type: T/T, L/c,D/P D/A, MoneyGram, Credit Card, PayPal, Western UnionCash,Escrow; Language Spoken: English,Chinese, Spanish, Russian




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
35 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.