SF Flotation machine
Flotation
Production capacity: 0.2-24 m³/min
Applicable material: non-ferrous metals, ferrous metals and non-metallic mineral sorting
Structure
SF Flotation machine
1. belt wheel 2. aspirating tube 3. center cylinder 4. principal axis 5.
When the flotation machine works, the motor drives the impeller to revolve, so the centrifugal effect and negative pressure are produced. On one hand, ample air is absorbed and mixed with mineral slurry, on the other hand, the mixed mineral slurry is mingled with additive, meanwhile, the foams are thinning, the mineral is bounded with foams, and floats up to the surface of mineral slurry and the mineralized foam is formed. The liquid surface can be adjusted with the height of adjustment flashboard, so that the useful foams are scraped with squeegee.
Advantages
1.Large air-absorption capacity and low power consumption
2.Long service life of vulnerable parts
3.Suitable for flotation of large particle size materials
n compose a joint flotation unit with JJF flotation
Parameters
| SF Flotation machine | |||||||
| Model | Effective volume( m³ ) | Production capacity (m³/min) | Impeller diameter( mm ) | Impeller revolutions( r/min ) | Motor power(kw) | 2 tanks weight (kg) | |
| Agitator | Scraper blade | ||||||
| SF-0.37 | 0.37 | 0.2-0.4 | 300 | 352-442 | 1.5 | 0.55 | 940 |
| SF-0.7 | 0.7 | 0.3-1.0 | 350 | 336 | 3 | 1.1 | 1940 |
| SF-1.2 | 1.2 | 0.6-1.2 | 450 | 312 | 5.5 | 1.1 | 2800 |
| SF-2.8 | 2.8 | 1.5-3.5 | 550 | 280 | 11 | 1.5 | 4240 |
| SF-4 | 4 | 2 · 4 | 650 | 235 | 15 | 1.5 | 5200 |
| SF-6 | 6 | 3 · 6 | 760 | 191 | 30 | 2.2 | 6000 |
| SF-8 | 8 | 4 · 8 | 760 | 191 | 30 | 1.5 | 8584 |
| SF-16 | 16 | 5.0-16 | 850 | 169-193 | 45 | 1.5 | 14830 |
| SF-20 | 20 | 5.0-20 | 730 | 186 | 30X2 | 1.5 | 19646 |
Twenty years of manufacturing expencice enable our products already have been exrensivly used in metallurgy,beneficiation,city constrction,road constrction,also refractory materral industry.Besides expansion on domestic market,our products have also been exported to Canda,,,,South Afica,Central Asia,Weaten Asia and other cnuntries and regions.




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
30 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.