Diesel Rock Cutting Machine/Stone Cutting Machine Introduction
Diesel Rock Cutting Machine/Stone Cutting Machine is our newly developed Product which is a powerful and extremely cost effective alternative to other conventional demolition tools. It can develop a very huge splitting force (Maximum 1000 T) when it put into the pre- drill holes of rock or concrete pieces within several seconds. It is widely used in mineral mining (cave mining), civil engineering construction and demolition. It is also an indispensable tool in construction, river dredging, salvation etc.
Diesel Rock Cutting Machine/Stone Cutting Machine Parameter
| Model | Piston Diameter | Hole Diameter | Hole Depth(mm) | The length of the wedge | crack width | Split time | Theoretical splitting force | The actual split force |
| (Type) | (MM) | (MM) | (MM) | (MM) | (mm) | (S) | (T) | (T) |
| ZM( 32-38)A | 80 | Φ32~38 | ≥300 | 150 | 10~35 | 5~12 | 500 | 280 |
| ZM( 38-40)A | 80 | Φ38~42 | ≥300 | 150 | 10~40 | 5~12 | 500 | 280 |
| ZM( 38-40)B | 80 | Φ38~42 | ≥400 | 200/250 | 10~40 | 5~12 | 650/600 | 350/300 |
| ZM( 40-42) | 90 | Φ42~46 | ≥600 | 300 | 10~40 | 5~12 | 680 | 420 |
| ZM( 42-46) | 90 | Φ42~46 | ≥600 | 380 | 10~40 | 5~12 | 650 | 500 |
| ZM( 44-46)A | 100 | Φ44~46 | ≥600 | 300/380 | 10~40 | 5~12 | 780 | 550 |
| ZM( 44-46)B | 105 | Φ44~46 | ≥600 | 300/380 | 10~40 | 5~12 | 880 | 600 |
| ZM( 46-48) | 110 | Φ46~48 | ≥600 | 300/380 | 10~40 | 5~12 | 1080 | 700 |
| Poewr pump pack | Dimension (mm) | weight (kg) | Tank capability (L) | Engine power | pressure (MPa) | Flux (L/m) | Splitting ( pc ) |
| Diesel engine | 1150*1180*940 | 120 | 40 | 6Hp | 55-60 | 2-13 | 1-10 |
Diesel Rock Cutting Machine/Stone Cutting Machine Photos




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
Lead time will be confirmed with your quotation.
-
Step 3
Packaging and dispatch
Economy · Approx. shipping fee: $ 10.92 for 1 set · Estimated delivery: Oct 2–Oct 21 (26–45 days)
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.