Product details
Core Product Advantage: Oil distribution pan 86344199 is presented for hydraulic rock drill rigs used in subway tunneling and underground mining. The component is shown as a metallic pan shaped part with a recessed basin multiple mounting holes and a curved edge profile. This recognizable structure supports part identification during maintenance planning. It is positioned as a spare part for hydraulic drilling equipment. Confirm the part number and rig model before ordering. Practical Function Design: The oil distribution pan form is intended to support oil collection or distribution within a compatible hydraulic rock drill rig assembly. The recessed basin provides a defined containment area while the mounting holes support attachment to the related housing when correctly matched. Actual performance depends on the complete assembly oil routing seal condition and operating environment. Confirm the original pan profile and fitting positions before replacement. Material And Specification Details: The item is identified by Oil Distribution Pan 86344199 and listed for hydraulic rock drill rigs in subway tunneling and underground mining. The supplied images show a metallic pan with a recessed basin mounting holes and curved edges. Material composition overall dimensions wall thickness weight surface treatment oil capacity and tolerances were not provided and should be confirmed. Application Scenarios: This oil distribution pan can support tunneling equipment distributors subway construction contractors underground mining teams hydraulic drill rig repair workshops and spare parts wholesalers. It may be used for scheduled service field repair and procurement related to subway tunneling and underground mining operations. Packaging And Supply Support: The product is suitable for replacement and wholesale sourcing. Buyers can request availability and packing information. Before dispatch confirm part number quantity rig model fitment and packaging.




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
7 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.