Skip to Content

Browse

Coal Clean Energy Generator Syngas to Electricity 1MW Solutions Coal Power Plant by Gasification Technology

Available for enquiry 0.0 · 0 reviews
USD

236,350.00 236350.0 USD 236,350.00

Not Available For Sale

Minimum order quantity: 1 Units

Key attributes

View all
Voltage
220 V
Power (W)
1000kw
Core components
furnace
Machinery test report
Provided
Warranty
1 Year
Video outgoing-inspection
Provided
Product description

Highlights at a glance

  • Coal-to-gas power generation refers to the use of coal to gas as fuel gas to supply power generation units, converting thermal energy into electrical energy. Coal-to-gas, or coal gasification, refers to the process of converting coal into gas fuel through a series of chemical reactions. This gas fuel mainly includes carbon monoxide (CO), hydrogen (H) and methane (CH), etc. After purification treatment, these gases meet the gas requirements for power generation units and can be supplied to power generation units. The two-stage gas generator cold gas station in, Henan is specifically designed for gas internal combustion engine power generation units. The produced gas can meet the gas demand of gas internal combustion engine power generation after multi-stage purification. This type of generator set has the characteristics of low overall investment and stable operation, and is suitable for medium and small power generation projects..
  • Frequently asked questions

    We provide 24/7 after-sales service.

    The difference between hot and cold gas lies in the difference in sensible heat of the gas. The combustible components of the gas remain unchanged, so the calorific value does not change much.

    Yes,we have our own big factory,anytime welcome your visiting.
    Description images
    Product detail
    Product detail
    Product detail
    Product detail
    Packaging and fulfilment
    • Step 1

      Payment and order readiness

      Minimum order: 1 Units

      Payment terms, specifications, and order details are confirmed before preparation begins.

    • Step 2

      Preparation

      20 days

    • Step 3

      Packaging and dispatch

      Ocean freight via Maersk · Approx. shipping fee: $ 0.84 for 1 unit · Transit time: Est. 17-24 days

      Final packing, freight, and delivery dates are confirmed before dispatch.

    Technical specifications
    Other details 22 fields
    Voltage
    220 V
    Power (W)
    1000kw
    Core components
    furnace
    Machinery test report
    Provided
    Warranty
    1 Year
    Video outgoing-inspection
    Provided
    Place of origin
    China, Henan
    Weight (kg)
    4000
    Furnace inner diameter(mm)
    2400
    Furnace cross-sectional area(m2)
    4.52
    Applicable coal type
    Anthracite, bituminous coal
    Coal particle size(mm)
    20~50
    Coal consumption(kg/h)
    ≤700
    Gas production(m3/h)
    ≤2500
    Gas calorific value(KJ/m3)
    5020~6060
    Rated voltage
    400V
    Frequency
    50Hz
    Rated Speed
    1000r/min
    Selling Units
    Single item
    Single volume
    0 cm3
    Single gross weight
    0.0 kg
    Model number
    1000kw
    Lead time
    20 days
    Minimum order
    1 Units

    Customer reviews

    0.0 (0)

    No reviews yet

    Be the first customer to review this product.

    Write a review

    Up to 5 JPG, PNG or WebP images; 5 MB each.

    Request custom sourcing

    Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.

    Best-match productsCompetitive quotesFast turnaround
    Request custom sourcing

    Upload your requirements

    Upload your BOM, BOE, RFQ or requirement list and get one consolidated response.

    XLS, XLSX, CSV, PDF, DOC or images · Max 10MB each or drag and drop
    XLSX
    Files are sent securely.