Complete Solar System on Grid 7.2Kw 10 Kw 11Kw 15Kw 20KWH 48V 51.2V ff Grid Systems for Home Use
1,System configuration detailes
| 11KW/20KWH solar hybrid system configuration/Custom | ||
| Item | Desceription | Quantity |
| 1 | A grade 550W N type half | 16pcs |
| 2 | 11KW/48VDC/230VAC Hybrid inverter build in MPPT conroller(Wifi /parallel function for optional) | 1pcs |
| 3 | 6000+ cycle life 51.2V200AH lifepo4 battery with wheel including battery cable +communication cable | 2pcs |
| 4 | PV Mounted bracket(Ground/roof type for optional) | 1set |
| 5 | PV cable (Red 50M+Black 50M) | 2 bundles |
| 6 | MC4 connector | 16 pairs |
| 7 | IP65 lightning protection 440VDC "4 in 2 out "PV combiner box | 1pc |
2,Specification
2.1,Inverter
Wholesale Off Grid 11kw 8.5KW Solar Energy System 15kwh 20kwh 30kwh Lithium Battery for Residential Use System
3,Application
Here we will explain you the difference on On grid system,off grid system,on&off hybrid grid system.
1.1:On grid system:Mainly resell electrcity to government,not support connect battery bank. 1.2:Off grid system:It can be with battery bank as back up source and also can connect to the grid, when there are rainy days/night time,battery bank in low level,city power can supply power for your home appliance directly or charge battery bank,but can not resell electricity to government.
1.3:On&off hybrid grid system:It can be with battery bank and support exceed electricity feed into the grid(resell electricity to government)
4
5
Supported by a robust industrial chain and guaranteed direct sourcing, the company owns the following
We integrate resources across the entire production, supply chain, and cross-border service chain to ensure clients have complete control over the entire process, from raw material selection and production supervision to logistics and customs clearance, truly achieving seamless "factory-to-global" connectivity.
6
7,FAQ




-
Step 1
Payment and order readiness
Minimum order: 2 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
7 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.