Product introduction
An air separation plant is a place that specializes in air separation production. It separates the main components of the air, such as oxygen, nitrogen, and argon, through a series of complex and precise process flows. Its core equipment includes air compressors, precooling devices, purification systems, distillation towers, etc. First, the air is compressed, precooled, and purified before entering the distillation tower, where the gases are separated by using the difference in boiling points. The separated high-purity oxygen is indispensable in the fields of steel smelting, medical emergency, etc.; nitrogen is widely used in chemical industry, food preservation, etc.; argon is used in electronics, welding and other industries. Air separation plants provide key gas resource guarantees for many industries.
| Model | O2 Nm3h/Purity% | N2 Nm3h/Purity% | Working Period |
| KDON-50/100 | 50/99.6% | 100/<10ppmO2 | 6 months |
| KDON-100/200 | 100/99.6% | 2 00/<10ppmO2 | 6 months |
| KDON-150/600 | 150/99.6% | 6 00/<10ppmO2 | 6 months |
| KDON-170/400 | 170/99.6% | 4 00/<10ppmO2 | 6 months |
| KDON-350/800 | 350/99.6% | 8 00/<10ppmO2 | 6 months |
| KDON-550/1200 | 550/99.6% | 1200/<10ppmO2 | 12 months |
| KDON-1000/1000 | 1000/99.6% | 1000/<10ppmO2 | 12 months |
We have the most advanced automatic digital cutting equipment, automatic welding equipment, 360-degree shot blasting equipment, constant temperature drying equipment, etc. Each equipment will go through a full range of X-ray detection to ensure product quality
Our products have passed the certification of many inspection institutions at home and abroad, including ISO9001 international quality system certification, ASME, CE,CCS,BV,AAS and other certifications
Customers from many countries have come to




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
60 days
-
Step 3
Packaging and dispatch
Ocean freight via Maersk · Approx. shipping fee: $ 0.84 for 1 unit · Transit time: Est. 17-24 days
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.