Boiler Heating Element Super Heater Tube Bundle for Steam Turbine Power Generation Plant Boiler Spare Parts
scriptions
A superheater is a device used to convert saturated steam or wet steam into superheated steam or dry steam. Superheated steam is used in steam turbines for electricity generation, steam engines, and in processes such as steam reforming. There are three types of superheaters: radiant, convection, and separately fired. A superheater can vary in size from a few tens of feet to several hundred feet (a few metres to some hundred metres).
Reheaters and superheaters are a set of tubes located in the boiler. Steam from the water walls passes to the superheaters where it is heated above its saturation temperature until the maximum required operating temperature is achieved. The superheated steam then flows through the main steam piping to the high-pressure turbine. Exhaust steam from the high-pressure turbine is guided to the boiler for reheating and from there to the intermediate and low-pressure turbines. High reheating temperatures improve the output and efficiency of a power plant.
Super Heater Types
A radiant superheater is placed directly in the combustion chamber.
A convection superheater is located in the path of the hot gases.
A separately fired superheater, as its name implies, is totally separated from the boiler.
2. Technical Parameter
| Material | carbon steel, alloy steel, stainless steel or durable heat steel, 1.seamless steel tube;2.high temperature component |
| Tube OD | 30-60mm (customized order is also acceptable) |
| Tube Wall Thickness | 0.8mm- 15mm |
| Temperature | 540℃-570℃ |
| Structure | vertical or horizontal |
| Type | Radiant super-heater, convection superheater,plate super heater |
| Brand | |
| Remarks | Customized order is also accepted. |




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
15 days
-
Step 3
Packaging and dispatch
Ocean + Express via FLY Logistics · Approx. shipping fee: $ 103.20 for 1 set · Transit time: Est. 16-23 days
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.