1. Crawler self-propelled walking, easy to move and relocate
2. High output torque and strong power; Wide range of speed regulation
3. The body is compact and small, with strong passability
4. The pipeline routing is clear and easy to maintain, the hydraulic system is advanced, and the integration is high
5. The punching angle is large, which can achieve 360 ° all-round, the punching height adjustment range is large, and the stability of the body is high
| Item | specifications |
| Model | ZDY5000LPS |
| Size(mm) | 4070 × 1000 × 1770 |
| Weight (kg) | 6000 |
| Max drilling depth (m) | 400 |
| Hole diameter (mm) | φ94/φ113/ φ133 |
| Final hole diameter (mm) | φ94/φ113/ φ133 |
| Drill pipe diameter (mm) | φ 63/φ73 |
| Output speed (r/min) | 70~210 |
| Output torque (N · m) | 5000~1400 |
| Drilling apparatus | |
| Drilling inclination (°) | 90~+90 |
| Drilling azimuth (°) | 180~+180 |
| Feed force (KN) | 110 |
| Pull force (KKN) | 150 |
| Normal feed speed (m/min) | 0~1.5 |
| Feed stroke (mm) | 650 |
| Hydraulic system | |
| Rated power (kw) | 55 |
| Rated speed (r/min) | 1480 |
| Rated voltage (V) | 380/660 or 660/1140 |
| Large pump displacement (ml/r) | 80 |
| Small pump displacement (ml/r) | 23 |
| Walking device | |
| Walking speed (m/min) | not less than15 |
| Climbing capability (°) | 20 |
| Track shoe width (mm) | 230 |
Comprehensive and Solid Supply Assurance System As a professional one-stop manufacturer and supplier of equipment, we have always centered on meeting diverse engineering needs, building a full-range product matrix. Whether it is surface equipment such as drilling rigs, mud pumps and derricks, or underground drilling tools like drill pipes, drilling tools, diamond bits, reamers, etc., we can provide stable and reliable product support to ensure seamless connection of project links. Rooted in and dedicated to the industry, we take high-standard product quality as the foundation, focus on efficiency improvement and safety guarantee, and through full-chain supply services, provide solid support for the smooth progress of major projects, effectively safeguarding customers' core interests and operational results.


-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
31 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.