Introduction
XYX-3 XYX-200 drilling rig is mainly used for geological general investigation and exploration,kinds of hole in concrete structure,road and tall building foundation exploration,river levees,subgrade grouting hole drilling and direct grouting,civil wells and earth temperature central air conditioner,etc.
Parameter
| Trail Mounted Drilling Rig | ||
| The whole machine parameters | ||
| Model | XYX-3 | XYX-200 |
| Drill hole depth | 600m | 200m |
| Maximum opening diameter | 300mm | 300mm |
| Final hole diameter | Φ75mm | Φ75mm |
| Drill pipe diameter | Φ50,60mm | Φ50,60mm |
| Borehole inclination | 90°- 65° | 90°- 75° |
| Power(diesel engine) | 38/2400kw/r/min | 15/2200kw/r/min |
| Motor | 22kw | |
| Vertical shaft | ||
| Vertical spindle speed | 30-1050r/min | 64-557r/min |
| Vertical stroke | 600mm | 450mm |
| Hoist | ||
| Single line lifting capacity | 30KN | 24KN |
| Single rope lifting speed | 0.5-1.9m/s | 0.12-0.95m/s |
| Drum diameter | Φ305mm | Φ140mm |
| Diameter of wire rope | Φ12.5mm | Φ13mm |
| Wire rope capacity | 65m | 35m |
| Mud pump | ||
| Model | BW250 | BW160 |
| Flow | 250L/min | 160L/min |
| Maximum pressure | 17Mpa | 1.2Mpa |
| Reciprocating frequency | 93times/min | 93times/min |
| Water inlet diameter | Φ75mm | Φ51mm |
| Water to exit diameter | Φ50 | Φ32mm |
Product Display
• Hydraulic cylinder,high efficiency.
• Wheel walking mechanism,very convenient for transport and adjusting the drilling rig level.
• Pressure gauge display the condition of the bottom of the drill hole.
• Diesel engine with electric starter,convenient and reduce the labor itensity.
• Equipped with BW 250 mud pump.
Working
We believes that good quality can give us survival, thus we only provide you top products. All the products with high quality meet international standards and are highly estimated by all clients at home and abroad.
All the staff in
1. Packaging: 1)Wrapped by protective film
2)Packed by standard import & export wooden cases or carton boxes.
2. Shipping
By logistics; by automobile; by train; by shipping; by air etc.




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
7 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.