Product details
Strong and stable adsorption force, firmly adsorbs various ferromagnetic materials such as steel chips, steel plates, steel scrap, iron scrap, steel rebars, steel billets, pig iron ingots, cast iron parts, section steel, metal scrap, clumped metal chips, steel pipes, no sliding under shaking conditions, improving handling safety and efficiency.
Wide adaptation range, compatible with various equipment such as cranes (freestanding, bridge, gantry), forklifts, excavators, loaders, overhead cranes, suitable for different tonnages, covering steel scrap recycling stations, steel plants, foundries, machinery processing factories, steel warehouses, ports and docks, construction sites, metallurgical workshops, mold workshops, logistics handling yards, machine tool workshops and other scenarios, meeting the procurement needs of multiple foreign trade industries.
One-key suction and release control, suction when powered on and release when powered off, no manual assistance, saving labor and time, improving work efficiency.
High-efficiency coil design, energy-saving and power-saving, less heat generation, saving electricity for long-term use, in line with green environmental protection concept.
Multiple safety protections (overload, power failure, leakage), automatic shutdown in abnormal situations, preventing material falling and safety accidents.
Modular design, easy installation, no equipment modification, short cycle, quick to put into use.
Simple daily maintenance, only need to clean the adsorption surface and check the line, no professional personnel or complex tools, low cost.
High-temperature adaptable models available, work in high-temperature conditions such as metallurgy and foundry, adsorb high-temperature materials.




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
7 days
-
Step 3
Packaging and dispatch
Multimodal transport · Approx. shipping fee: $ 657.70 for 1 unit · Estimated delivery in 38-48 business days
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.