Pipe jacking rock crushing small tunneling electro hydraulic stone splitting machine
1. Splitting and breaking of rock, rock excavation, secondary splitting of rock or ore, tunnel excavation, underground mine excavation and extension, pipeline excavation.
2 quarry material mining, marble, granite, sandstone.
3. Demolition of plain concrete and reinforced concrete, demolition of reinforced concrete structures, demolition of closed places and inaccessible Spaces, demolition of narrow Spaces, demolition of rock and concrete walls, removal of concrete pile heads, demolition of chimneys, secondary splitting of large blocks of concrete.
4. Application in metallurgical industry, overhaul of electrolytic
| Drilling diameter | 38mm |
| Piston cylinder bore | 80mm |
| Qieer block length | 150mm |
| Small drilling depth | 300mm |
| Total split gun length | 720mm |
| Crack width | 10-40mm |
| Splitting time | 5-12s |
| Theoretical splitting force | 615T |
| Actual splitting force | 320t |
| Single weight | 14kg |
1. 24 hours on line service, support Chinese, English, Spanish, French, German, Russian,technical guidance.
2. When meets machine failure problem
3. Povide machine install video.
4. Provide logistics information, like shipping by sea, shipping by express DHL, FEDEX delivery, real-time tracking service.
5. If machine is broken,Non-human causes,the new machine will be provided or new parts will be provided.
This is our new branch.
Are you manufacture?
Yes. We are one of leading manufacturers
Do youhave Stockproductions to sell?
Yes,ofcourse.Butwe also offer OEM service. Please send us some drawing.
What information do you want to know if i want to get a quotation?
a). The model/size of your products.
b). The application for your products.
c). Special package methods if you needs.
d). Raw material.
Do you inspect the finished products?
Yes.Each step of products will be carried out inspection by QC department until shipping
What advantages do you have?
(1) Punctual: Have your orders met with the latest delivery?
(2) 20year production experience. We have over 20 years exprerience in this industry.
That means we can preview the problems for the orders and production. Therefore, it will make sure to deduce the risk of bad situation to happen.
(3) Point to point service.
There is two sales departments who will serve you from inquiry to products shipped out. During the process, you just need to discuss with him for all the problems and the way sames much times




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
10 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.