High pressure vertical oilfield cyclone desander slurry mud separation
High pressure vertical oilfield cyclone desander slurry mud separation is a wellhead desander designed to provid efficient and reliable separation of sand and solids from hydrocarbon and water effluent during either the early life of a well (well cleanup) or its producing life (recovery of formation sand).
The technical parameters of high pressure vertical oilfield cyclone desander slurry mud separation
| Maximum working pressure | 105MPa |
| Maximum working tempreature | 120℃ |
| Environment temperature | 40℃~70℃ |
| Gas inlet (DN) | 65mm |
| Gas outlet (DN) | 65mm |
| Working medium | oil,gas,water |
| Inlet and outlet size | 2-9/16" |
| The volume of pots | 46L |
| Gas processing capacity | 1,500,000N lm³/d |
| Anti-sulfur grade | 0.1 |
| Design Codes | API-6A (PSL-3), ASME B31.3 |
Main features of our high pressure vertical oilfield cyclone desander slurry mud separation as below
1.High efficient upstream solids removal st effective protection of chokes,flowline manifolds against erosion damage 3.Simple structure, easy installation 4.Low maintenance 5.Simple to operate 6.Uninterrupted continuous operation 7.Well-proven technology
Our main factory located in JiangSu province,YanCheng city, and we have professional design and product team.We have got ASME certificate. And we could design and manufacturer based on client's demand.The following photos are part of our products.If you are interested in our products, welcome to contact with us.
Customers visit and the third party factory inspection are warm welcomed at any time.Strict quality control is our first promision to
Any question or interest about our oilfield cyclone desander slurry mud separation, please don't hesitate to contact with us. It's our honor to help and support your business.
Just send your inquiry in the textbox below!




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
30 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.