API 4F Origin ZJ15 100t 550hp truck-mounted workover rig
XJ550 ( 100t ) workover& drilling rig is dedicated equipments for oilfield. The rig adopts 10x8 driven type chassis, Caterpillar engine and Allission transmission (can use brand also), and double drum draw-works. Max. hook load is 1350KN. The mast height is 35m. The rig equipped with rotary table, platform, and swivel etc.
Adopts double section hydraulic lifting, flexible mast, the height is 35m.
Equipped with double CAT C15 engine and Allission M5620AR transmission. The performance is stable and reliable.
The driven model of chassis is 10x8. Single cab. With heater.
The main drum adopts ATD324 disc brake, and assis brake is air control disk type brake.
Anti-collision crown block.
Fingerboard of monkey board is longitudinal arrangement, the beam space can be adjusted. Equipped with aid climbing implement and escape device.
All pneumatic pipelines adopt FESTO quick-coupling and pipeline.
Meter system adopts 24V DC, and lighting system supplied power by external AC power.
Technical Parameters
| Description | XJ550(100t) | ||
| Workover depth | Φ73mm (2 7/8”upset tubing) | m | 7000 |
| Service depth | Φ73mm( 2 7/8”DP) | m | 5800 |
| Φ88.9mm( 3 1/2”DP) | m | 4500 | |
| Φ114mm(4 1/2”DP) | m | 3600 | |
| Drilling depth | 1500 | ||
| Rated hook load | 1000 | ||
| Max. hook load | 1350 | ||
| Engine model | CAT C15 | ||
| Engine power | 403 ( 540 ) | ||
| Transmission | Allision M5620AR | ||
| Chasssis driving form | 10x8 | ||
| Approach/departure | 25°/ 16° | ||
| Min. ground clearance | 310 | ||
| Derrick height | 35 | ||
| Derrick type | front opened, double section hydraulic lifting, flexible mast | ||
| Valid rope number | 8 ( 4x5 ) | ||
| Hoist rope diameter | Φ26 | ||
| Transportation dimensions ( length x with x height ) | 19.87x3.10x4.20 | ||
| Total weight | 53000 | ||
| Drum | Single / double drum | ||
| Main drum assist brake system | Air control disk type brake / hydraulic control disc brake / hydraulic brake |



-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
90 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.