quality products fuel/liquid/hydraulic/gas quick connector,pipe coupling fitting manufacturer
Specializes in stainless steel lost wax precision investment castings, and the fabrication and sale of valves, pipe fittings and sanitary fittings. We can also design and develop as per customers' requests.
At present, our product categories include quick couplings, sanitary unions and various types of fittings. Tailor-designed machining is also available. Our products are made in accordance with API, ANSI, DIN, BS, and JIS standards.
We ensure interior and exterior quality with advanced silica wax-lost casting technology and high-precision CNC lathes, as well as sophisticated spectrum analyzers and chemical analyzers, metallurgical microscopes, a hardness tester and universal testing machine.
We have sold to buyers in countries such as the,,,,,, and others. We impress
Function
Use notes
Products details
| Products | Quick Coupling; Camlock coupling |
| Material | Stainless Steel 304/316;Brass;Aluminium |
| Thread | ANSI B1.20.1(NPT), BS21,DIN259,DIN2999,ISO228 |
| Size | 1/2’’-6’’ |
| Gasket | buna(NBR),viton and Teflon,silicon |
| Application | Oil,gas,water,chemical,petroleum |
| Specification | MIL-C27487 |
| Test pressure | 3/4’’-2’’ 250PS(17.6bar);3’’-4’’ 200PS(14.8bar);2 1/2’’ 225PS(15.8bar);6’’ 150PS(10.5bar) |
| Connection | male,female,connecting hose,welding,flange |
| Technology | Investment casting,forging,CNC precisely machined |
| Assembly parts | Pins,rings,safety handle,safe-pin,gasket |
| Place of origin | Shandong,(mainland),Manufacturer |
| Packing | Standard export packing |
Application
Quick couplers may be specifically designed and rated for a particular application or industry.
Welcome to your inquiry!
Major export countries




-
Step 1
Payment and order readiness
Minimum order: 100 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
15 days
-
Step 3
Packaging and dispatch
Economy · Approx. shipping fee: $ 328.62 for 100 pieces · Estimated delivery: Oct 1–Nov 9 (31–70 days)
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.