Manual Rock Block Hammer Splitter Portable Stone Splitter rock splitter
| Product Name | Manual Rock Block Hammer Splitter Portable Stone Splitter |
| Description | Hand-held pneumatic tool, use compressed air to push the piston reciprocating movement, keep the pick up to the impact. Belongs to a kind of pneumatic instrument combined with the mature international technology. |
| Application | To split,break,dig for all kind of construction stone. Widely used in mining, road construction, concrete and other hard objects demolition. |
| Advantages | Portability, durability, high efficiency and speedy |
| Spare parts | wedge and feathers |
| MOQ | No requirement for testing and trial order |
Specification of p neumatic hammered splitters
| Model | DTF-4B |
| Weight (kg) | 13 |
| Length (mm) | 585 |
| Impact power (J) | ≥60 |
| Working pressure (Mpa) | 0.7 |
| Air consumption (L/s) | 25.5 |
| Impact frequency (Hz) | 17 |
The information you may like to know before order
1. Methods of Payment
T/T (Telegraphic Transfer) or Western Union or L/C at sight
2. Handling time for an order
Normally. it takes about 10 days supplied from stock.
And it takes about 20 days if need any changement to meet normals in your side.
3. Shipping way
By air or by sea.
4. Quality Control
We have our own experienced QC.
There will be strict inspection and testing for every order before shipping out.
5. After Services
a. Our sales team will response for your question within 24 hours (Holidays Excluded)
b. Technical Support will be available at any time
c. Free replacement will provide once the failure confirmed caused by our product quality
1.
2. We have advanced technology and equipment.
3. Our technician has more than 25 year’s professional working experience.
4. Rock drilling tools are exported throughout the world. Main market
etc.
air pick | selección aire | picareta do ar | choix air | Luft holen | hava almak | aria ripresa




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
15 days
-
Step 3
Packaging and dispatch
Economy · Approx. shipping fee: $ 58.31 for 1 set · Estimated delivery: Oct 4–Nov 10 (27–64 days)
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.