API Heavy Duty Steel Drill Pipe Thread Protector
| Size | Thread | Steel & Plastic |
| 2 3/8" | NU, EU, NUE, EUE, REG, NC, IF, VAM, VAM TOP, OTTM | √ |
| NC26 (2 3/8") | IF | √ |
| 2 7/8" | NU, EU, REG, PAC, PAC DS HT PAC, NUE, EUE, REG, NC, IF, VAM, VAM TOP, OTTM | √ |
| NC31 (2 7/8") | IF | √ |
| 3 1/2" | NU, EU, REG, FH, NUE, EUE, REG, NC, IF, VAM, VAM TOP, OTTM | √ |
| NC38 (3 1/2") | IF | √ |
| 4" | EU, FH, NUE, EUE, REG, NC, IF, VAM, VAM TOP, OTTM | √ |
| NC 46(4") | IF | √ |
| 4 1/2" | NU, EU, STC, LTC, BTC, REG, XH, FH, NUE, EUE, NC, IF, VAM, VAM TOP, OTTM | √ |
| NC 50 (4 1/2") | IF | √ |
| 5" | STC, LTC, BTC | √ |
| 5 1/2" | STC, LTC, BTC, REG, XH, FH, NC, IF, VAM, VAM TOP, OTTM | √ |
| 6 5/8" | STC, LTC, BTC, REG, XH, FH, NC, IF, VAM, VAM TOP, OTTM | √ |
| 7" | STC, LTC, BTC, REG, XH, FH, NC, IF, VAM, VAM TOP, OTTM | √ |
| 7 5/8" | STC, LTC, BTC, REG, XH, FH, NC, IF, VAM, VAM TOP, OTTM | √ |
| 8 5/8" | STC, LTC, BTC, REG, XH, FH, NC, IF, VAM, VAM TOP, OTTM | √ |
| 9 5/8" | STC, LTC, BTC, REG, XH, FH, NC, IF, VAM, VAM TOP, OTTM | √ |
| 10 3/4" | STC, LTC, BTC, REG, XH, FH, NC, IF, VAM, VAM TOP, OTTM | √ |
| 11 3/4" | STC, LTC, BTC, REG, XH, FH, NC, IF, VAM, VAM TOP, OTTM | √ |
| 13 3/8" | STC, LTC, BTC, REG, XH, FH, NC, IF, VAM, VAM TOP, OTTM | √ |
| 16" | STC, LTC, BTC, REG, XH, FH, NC, IF, VAM, VAM TOP, OTTM | √ |
| 18 5/8'' | STC, LTC, BTC, REG, XH, FH, NC, IF, VAM, VAM TOP, OTTM | √ |
| 20" | STC, LTC, BTC, REG, XH, FH, NC, IF, VAM, VAM TOP, OTTM | √ |
is well-reputed manufacturer and exporter of Oil and Gas Equipment. Our products are manufactured by using best material and modern techniques, which make them extremely up to the standard in this challenging domain. The offered products are highly appreciated among customers due to their corrosion resistance, robust design, optimum finish and high tensile strength. Also, these are available in various sizes, dimensions and patterns in order to meet the requirements of customers.
DIC OIL & GAS TOOLS consider quality as an integral aspect of our process as it's not only for satisfies customers but also imparts us with a feeling of contentment. Quality is our mission. We maintain a strict quality management policy, which is religiously practiced within the organization.




-
Step 1
Payment and order readiness
Minimum order: 50 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
25 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.