1.MgO Board performance: A. Oxygenic index%: >90 B. Level combustion: SO C. Vertical combustion: SO D. Water content rate: 10.9% E. Capacity: 1.15g/cm3 F. Static bending intensity: 169.46Mpa G. Density: T/ m3 1.13 H. Water resistance: Without chalking for 24 hours and there is no change on surface I. No "Three-wastes" (waste water, waste gas and waste residue), no pollution and environmental protection
2.Raw material and cost analysis
The product is formed with crushed crop straw or sawdust and some inorganic chemical materials at one time after roller-extruding. The source of raw materials is widely and they are purchased easily for customers.
Raw material
| ceiling board | interior wall paneling | partition wall |
| indoor background | exterior wall panels | floor board |
| roof tile | wall cladding | eps sandwich panel |
| other usage need waterproof,fireproof,high-temprature resistance,soundproof,etc. |
1.Batching system
The agitator mixes liquid and solid raw material. It feeds mixed slurry into forming system, providing slurry for forming system.
2.Forming line and batching platform
The forming line is the mainframe for the whole line. Mixed wet slurry is fed onto moulding board moving with constant speed, via a storage tank and feeder.
3. Automatic board receiving system
The wet board will enter the automatic receiving system after has been cut with presetting length.This system adopted microcomputer and double elevators.The wet board with moldboard will enter the curing transporter layer by layer following the order of the microcomputer twenty boards with one curing transporter, and the double elevator achieve process production and volume-produce through alternate use.
4. Solidifying rom with trackway style
This set of
moulding machine
This demoulding machine separately absorbs MgO boards and mould board with a vacuum device. It puts MgO board and mould into respective stacking machine separately.
Warehouse
Our Warehouse
Conference room
Our Conference room
1.




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
150 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.