Characteristics & advantages of this products
1. Open mouth, enter and exit the working position fast and convenient, patented technology notch big gear support structure, so that the strength and stiffness of the clamp head greatly improved.
2. Swing type double jaw plate pliers head, disassembly is very convenient; Optimal cutting ratio design ensures reliable clamping; The jaw plate is cast of precision alloy with beautiful appearance and high strength.
3. Strengthened shell and transmission gear, improve the service life of power pliers.
4. Brake belt braking mode, large braking torque, easy adjustment, easy maintenance and replacement.
5. The roller supporting the notched gear is a self-lubricating curved roller, which can withstand the impact load and make the lubrication and maintenance of the clamp head easier.
6. Swing cylinder type low speed high torque motor, to provide efficient power for the pliers; Gear ring clutch shift, flexible and reliable operation.
7. With a hydraulic torque indicator, and the number of turns and torque sensor installation interface, easy to achieve computer management.
1. How can we guarantee quality?
We consistently provide a pre-production sample before mass production.We perform thorough final inspections before shipment.
2. What can you buy from us?
We offer a wide range of products including drilling rigs, mud pumps, top drives, drawworks, and various spares.
3.
As a solution provider for mud pumps and drilling pumps in the oil and gas industry. We specialize in consumable parts, focusing on increasing parts' lifespan, reducing operational costs, and shortening downtime. Our parts are meticulously manufactured to the highest standards.
4. What services can we provide?
Accepted Delivery Terms: FOB, CFR, CIF, EXW, CIP, FCA, CPT, DDP, DDU
Express Delivery.Accepted
Payment Currencies: USD, EUR, CNY
Accepted Payment Types: T/T, L/C, D/P, D/A.



-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
30 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.