1. Liquid storage:biogas slurry be sent to raw material tank after preprocessing, then be sent to
fermentation tank 2. Incculated fermentation: The biogas in fermentation tank be inoculated with specific beneficial
organisms and with sufficient stirring and mixing 3. Nutrients adding: Liquid be sent to mixing tank and be added with nutrients 4. Liquid storage: Liquid sent to finish-tank for storage 5. Liquid sent to packing tank 6. Packing
| Liquid fertilizer filling | ||
| Package | Bottle | Barrel |
| Shape | Round/Square | |
| Filling range(L) | 0.1-1 | 5-30 |
| Filling speed | <4000bottles/h | 8-12 barrels/min |
| Power supply | AC 380V 50HZ | |
| Air pressure(Mpa) | 0.6 | |
| Accuracy | ±0.1% | ±0.1% to ±0.3% |




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
30 days
-
Step 3
Packaging and dispatch
Ocean freight via Maersk · Approx. shipping fee: $ 0.84 for 1 unit · Transit time: Est. 17-24 days
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.