Product details
Our 150-pound WCB gate valve is designed for heavy-duty service and provides highly reliable shut-off in high-pressure and high-temperature environments, ensuring maximum system safety and operational continuity for global B2B industrial projects.*High-grade ASTM A216 W.C.B. structure: Made from high-grade cast carbon steel (W.C.B.), these valves have superior structural strength and impact toughness compared to cast iron, and can effectively handle harsh pipeline stresses and temperatures up to 425°C (800°F). To ensure seamless integration and 100% interchangeability in international oil, gas, and petrochemical infrastructure. * Zero-leak Stellite alloy hard face seal: Using precision-machined flexible wedge parts and Stellite alloy or 13Cr alloy hard face seal rings, it has excellent anti-corrosion, anti-wear, and anti-corrosion performance, and can achieve a durable, air-tight seal. *OS&Y operation safety design: The external thread and blade (OS&Y) structure protects the thread of the valve stem from corrosion and lubrication loss of the process medium, and at the same time can immediately and intuitively confirm the opening/closing state of the valve. *Low-torque precision engineering: Equipped with ACME threaded valve stems and high-quality thrust bearing assemblies, these valves can reduce manual operation torque by up to 30%, ensuring smooth operation and reducing wear on internal components. * Wide range of heavy industry applications: ideal for oil refineries, chemical processing plants, power generation facilities, steam distribution networks, and municipal utilities that require reliable 150-class isolation valves. Each WCB gate valve is subjected to 100% water pressure and air testing in accordance with API 598, providing international buyers with a high return on investment and zero-defect solutions for critical pipeline procurement and large-scale infrastructure upgrades.




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
7 days
-
Step 3
Packaging and dispatch
Ocean freight via Maersk · Approx. shipping fee: $ 0.84 for 1 unit · Transit time: Est. 17-24 days
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.