Skip to Content

Browse

Tigerrig Long Manufacture History XJ1350 Onshore Workover Oilfiel Drilling Rig

Available for enquiry 0.0 · 0 reviews
USD

17,582,260.00 17582260.0 USD 17,582,260.00

Not Available For Sale

Minimum order quantity: 1 Units

Key attributes

View all
Type
workover rig
Power Type
Diesel
Voltage
540V
Machinery test report
Provided
Warranty
1 Year
Core components
Bearing, Motor, Engine, Pump, Gearbox, valves
Product description

Tigerrig long manufacture history XJ1350 onshore workover oilfiel drilling rig

We have a number of patented technologies. A wealth of design experience, sophisticated manufacturing process, on-time delivery.

We have created "TIGERRIG" brand in 25 years ago, which is a well-known Chinese brand.

Up to now, we have product more than 80 rigs and rig parts, operating well and normally major oil fields.

If you have good faith to buy, welcome to visit our factories, you will definitely buy the reliable quality, economical, durable of drilling rig in

XJ series workover rig includes lifting operation system, rotary operating system and chassis walking system. The product is well equipped with a wide range of is equipped with drilling platform and related parts for overhaul. It has the characteristics of reasonable layout, compact structure, good transport performance, convenient site installation and simple maintenance.

ModelXJ1350(XJ100)
Nominal service depth (ft) ( 27/8″EUE tubing )23000
Nominal workover depth (ft) ( 27/8″DP )19000
Drilling depth (ft) ( 41/2″DP )6600
Max. hook load (lbf)300000
Rated hook load (lbf)220000
Engine modelC15
Engine power (hp)540
Hydraulic transmission box modelS5610HR
Transmission typeHydraulic +
Effective height of mast (ft)35102,108
Traveling system5×4
Drilling line diameter (in)1”
Hook speed (ft/s)0.66 ~ 4.6
Chassis model/Drive waysXD50/10×8
Approaching/departure angle26°/18°
Min. ground clearance (in)12
Max. gradient ability (%)26%
Min. turning diameter (ft)108
Rotary table modelZP135
Traveling block modelYG135
Swivel modelSL135
Overall moving dimension (ft)61×10×14
Main unit mass (lb)120000

1. Reply within 3 hours after receiving the inquiry

2.24 hours online

3. We have professional translators (Russian, Spanish, Arabic, English, etc.)

4. We will complete the quotation within one to two weeks

5. The product warranty period is one year

6. We will provide a competitive price according to different bidding requirements

What do you need to do?

1. Provide the original bidding documents for our review and translation (preferably in Excel or word format, the documents in picture format may affect the processing speed)

2. Provide

3. Our industry tends to pay by T / T, and L / C mode is not considered temporarily

4. Please let us know the bid closing time so that we can be well prepared

5. Please leave the

1. What is the delivery time of the rig? Delivery time is about three months to half a year, so please be patient.

2. Can I provide on-site installation services? Yes, we will send 5-7 drilling engineers to the site for installation, which will take about a week to complete.

3. Can I be your tiger agent in our country?

Answer: We are developing agents all over the world; you can sign agency agreement with us.

4. Q: What is the warranty time of your products? R: The warranty time is 12 months from the date of the commissioning. After the warranty, any questions and needs, please

5. How many years is your factory?

We have our own factory; we have more than ten years’ history

Description images
Tigerrig Long Manufacture History XJ1350 Onshore Workover Oilfiel Drilling Rig
Tigerrig Long Manufacture History XJ1350 Onshore Workover Oilfiel Drilling Rig
Tigerrig Long Manufacture History XJ1350 Onshore Workover Oilfiel Drilling Rig
Tigerrig Long Manufacture History XJ1350 Onshore Workover Oilfiel Drilling Rig
Packaging and fulfilment
  • Step 1

    Payment and order readiness

    Minimum order: 1 Units

    Payment terms, specifications, and order details are confirmed before preparation begins.

  • Step 2

    Preparation

    2 days

  • Step 3

    Packaging and dispatch

    Economy · 3-day dispatch · Approx. shipping fee: $ 0.61 for 1 set · Estimated delivery: Oct 2–Nov 12 (24–65 days)

    Final packing, freight, and delivery dates are confirmed before dispatch.

Technical specifications
Other details 26 fields
Type
workover rig
Power Type
Diesel
Voltage
540V
Machinery test report
Provided
Warranty
1 Year
Core components
Bearing, Motor, Engine, Pump, Gearbox, valves
Video outgoing-inspection
Provided
Place of origin
China, Sichuan
Weight
1500 kg
Dimension (L*W*H)
74*100*200
Application
Well drilling
Model
XJ1350
Nominal service depth
23000
Nominal workover depth
19000
Drilling depth (ft)
6600
Max. hook load
300000
Rated hook load
220000
Engine model
C15
Hydraulic transmission box model
S5610HR
Effective height of mast
35102,108
Packaging Details
Fumigation of wood package is free, if want Tin trunk package, need to pay tie box cost according to buyer's requirement. sales record more than 200000usd, Tin trunk package is free.
Selling Units
Single item
Single package size
25X24X25 cm
Single gross weight
12.500 kg
Power (W) (Product option)
540
Model number
XJ1350
Lead time
2 days
Minimum order
1 Units

Customer reviews

0.0 (0)

No reviews yet

Be the first customer to review this product.

Write a review

Up to 5 JPG, PNG or WebP images; 5 MB each.

Request custom sourcing

Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.

Best-match productsCompetitive quotesFast turnaround
Request custom sourcing

Upload your requirements

Upload your BOM, BOE, RFQ or requirement list and get one consolidated response.

XLS, XLSX, CSV, PDF, DOC or images · Max 10MB each or drag and drop
XLSX
Files are sent securely.