Product details
316 Stainless Steel Compliant with NACE MR0175 Requirements for H2S Sour Service in Refinery and Gas Plant Environments, Molybdenum Content Resists Chloride Pitting in Desalination Brine and Coastal Refinery Atmosphere, Material Resists Chemical Vapor Exposure and Acid Cleaning Cycles, Spectrometer Verified Composition with Material Certificate for Plant Integrity Audit Compliance
Engineered for Refinery Pump and Compressor Skid Lifting, Chemical Reactor and Heat Exchanger Head Handling, Desalination Plant Membrane Vessel and Pump Maintenance Lifting, Port Ship Cargo Handling Equipment Maintenance Points, Offshore Platform Equipment Access Lifting, DIN582 Design Rated for Process Plant Maintenance and Emergency Equipment Lifting Operations in Corrosive Industrial Atmospheres
Forged Ring Carries Rated Load with Zero Permanent Deformation During Process Plant Maintenance and Emergency Lifting, Full Thread Engagement Secures Lifting Point Against Vibration from Pumps Compressors and Ship Engines, Smooth Ring Contour Prevents Sling Damage During Confined Space Equipment Lifting, Progressive Yield Provides Advance Warning Preventing Dropped Loads That Could Strike Pipework or Valve Assemblies in Process Areas
Hot Forged Grain Flow Following Ring Contour Resisting Fatigue Through Repeated Maintenance Lifting Cycles in Refineries and Desalination Plants, Laser Engraved WLL and Grade Marking Resists Chemical Vapor and Brine Exposure Maintaining Field Identification for Plant Safety Inspections, Batch Material Certificate with Spectrometer Data Supports Process Industry Material Traceability Audits, 100 Percent Dimensional Thread and Magnetic Particle Inspection, DIN582 with NACE and ISO 9001 Compliance




-
Step 1
Payment and order readiness
Minimum order: 100 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
7 days
-
Step 3
Packaging and dispatch
Ocean freight via Maersk · Approx. shipping fee: $ 0.84 for 1 unit · Transit time: Est. 17-24 days
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.