Product details
Tired of high electricity bills and expensive grid upgrades? Our Solar-Storage-Charging Integrated Station allows you to install DC fast chargers even on a weak grid. Cut energy costs by 30% with solar+storage, or run completely off-grid
Reduced Electricity Costs · Solar power generation reduces the amount of electricity purchased from the grid.
Demand Charge Management · The battery storage discharges during peak load hours, significantly lowering demand charges for commercial users.
Arbitrage Revenue · Charge the battery when electricity prices are low (e.g., at night) and discharge to charge EVs when prices are high (e.g., evening peak hours).
No Grid Upgrade Required · Eliminates the high cost and long waiting time of transformer expansion. Install DC fast chargers even on sites with grid capacity.
Plug-and-Play Installation · The system acts as a "power buffer" - when the grid falls short, the battery storage discharges to support EV charging.
Off-Grid Capability · Can operate independently as a microgrid or emergency power source in areas with unstable or no grid connection, ensuring 24/7 uninterrupted charging service.
Zero-Carbon Operation · Achieves truly green mobility, with the charging station itself operating at zero carbon emissions.
Enhanced Site Value · The solar canopy not only generates power but also provides shade and rain protection for vehicles, upgrading the appearance and technology image of commercial complexes.
Smooth Power Output · The energy storage system effectively smooths out fluctuations from solar generation and the impact of fast chargers on the grid, protecting battery life.
Stable Charging PowerDelivers more consistent and reliable charging power to EVs, improving user experience and equipment durability.




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
25 days
-
Step 3
Packaging and dispatch
Ocean freight via Maersk · Approx. shipping fee: $ 0.84 for 1 unit · Transit time: Est. 17-24 days
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.