Notice For Price
1. The configuration and price are different according to different requirements.
2. All prices on this page are auto-generated virtual prices. Please
Professional High Efficiency Mining Equipment Ball Mill Processing Plant for Gold Mining
| Professional High Efficiency Mining Equipment Ball Mill Processing Plant for Gold Mining is common used grinding plant in the industry, and it is key equipment used for milling after materials are crushed. Professional High Efficiency Mining Equipment Ball Mill Processing Plant for Gold Mining is widely used in powder-making |
| Ball Mill |
Technical Parameters
| Model | Rev. of barrel(rpm) | Max ball load(t) | Maximum feed size(mm) | Output fineness(mm) | Capacity(tph) | Power (kW) | Weight (t) |
| φ1200×4500 | 32 | 5.5 | ≤25 | 0.074-0.4 | 1.6-5.8 | 55 | 13.8 |
| φ1500×3000 | 31 | 6.8 | ≤25 | 0.074-0.4 | 2-7 | 75 | 17 |
| φ1500×4500 | 27 | 10.5 | ≤25 | 0.074-0.4 | 3.5 · 8 | 110 | 21 |
| φ1500×5700 | 27 | 15 | ≤25 | 0.074-0.4 | 3.5-10 | 132 | 24.7 |
| φ1830×3000 | 26 | 13 | ≤25 | 0.074-0.4 | 4-12 | 160 | 28 |
| φ1830×6400 | 26 | 23 | ≤25 | 0.074-0.4 | 6.5-15 | 210 | 34 |
| φ1830×7000 | 26 | 25 | ≤25 | 0.074-0.4 | 6.5-22 | 210 | 36 |
| φ2200×5500 | 21 | 30 | ≤25 | 0.074-0.4 | 10-20 | 245 | 48.5 |
Customer Sites
Our Strength
| ♦ |
| ♦ We follow the standard of CE, ISO9001, Ghost, CU-TR. |
| ♦ |
| ♦ We send engineers for installation, commissioning and training. |
| ♦ We have sufficient spare parts in stock. |
| ♦ We have lots of production sites running aroud the world. |
| ♦ Fast maintenance system to deal with customers's |
FAQ
A: We are factory.
Q2: How long is your delivery time?
A: Generally it is 7-10 days if the goods are in stock. Or it is 15-30 days if the goods are not in stock, it is according to quantity.
Q3: What is your payment method?
A: 30% of total prices should be paid by T/T as down payment; 70% balance payment should b paid by T/T before delivery.
Q4: How long is the warrenty of your equipments? Does your company supply the spare parts?
A: The warranty period of crusher equipments is one year. And we will supply the spare parts for you at lowest cost.
Q5: If I need the complete crushing plant can you help us to build it?
A: Yes, we can help you set up a complete crushing line and give you related professional advices as long as you need. We had already build many mining projects & Overseas.
Thanks for your trust! We can provide you with design scheme for complete production lines according to your demands and the site conditions. In order to recommend a suitable model for you and send you a best quotation. So please give us more information about your requirement.
1. What is the raw material to be processed?
2. What is your required capacity (t/h)?
3. What is the input size of the raw material?
4. What is the output size of the product you want?
Look forward to your inquiries! We will recommend the proper machine for you!




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
45 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.