Sea suction dredger used plastic dredge floater with dredging pipeline
| No. | Structure Name | Material |
| 1 | Polyethylene Hull | Polyethylene |
| 2 | Hard Polyurethane Foam | Closed |
| 3 | Steel Bolts & Nuts | Metal |
Brief Introduction of Dredge Floats: The hull of MDPE FLOATER is made from medium density polyethylene material with excellent flexibility, filled with high strength polyurethane foam inside. With reasonable structure and good performance, the MDPE floater becomes the ideal substitution of the traditional steel floater for the floating dredging pipes.
Main Features of Dredge floats: 1. Good flexibility, excellent impact resistance, particularly suitable for constructions in open sea; 2. Easy to install and handle, lower costs for moving; 3. Higher corrosive resistance, longer working life, 3 times longer than steel floaters; 4. Lower costs, the cost performance is better than steel floaters.
Applications: ed in dredging sand pipeline; can be used in dredger, dredging pipe etc. in the sea, lake or river; 3.Particular used in laying the pipes on the water used in dredger project.
Remarks: 1. 2 pieces of floaters form 1 set, 2 sets of floaters form 1 pair. 1 pair of floaters could float 6 meter long steel dredging pipe and 1.5m long rubber hose. 2. The floaters under the size of O.D4m*L4m are all available.
Specification table of Dredge Floats
| PIPE OD(mm) | FLOATER ID(mm) | FLOATER OD(mm) | FLOATER LENGTH(mm) | FLOATER THICKNESS(mm) | NET BUOYANCE(kg) | FLOATER WEIGHT(kg) |
| 50 | 60 | 300 | 500 | 7 | 80 | 10 |
| 159 | 220 | 500 | 800 | 7 | 200 | 16 |
| 205 | 220 | 500 | 800 | 7 | 200 | 16 |
| 219 | 220 | 500 | 800 | 7 | 200 | 16 |
| 273 | 300 | 700 | 1200 | 7 | 420 | 43 |
| 300 | 300 | 700 | 1200 | 7 | 420 | 43 |
| 325 | 375 | 1100 | 1100 | 7 | 920 | 72 |
| 350 | 375 | 1100 | 1100 | 7 | 920 | 72 |
| 400 | 414 | 1100 | 1200 | 8 | 1020 | 76 |
| 426 | 430 | 1200 | 1200 | 8 | 1200 | 93 |
| 450 | 480 | 1300 | 1300 | 8 | 1500 | 116 |
| 500 | 580 | 1400 | 1500 | 9 | 2219 | 170 |
| 536 | 580 | 1400 | 1500 | 9 | 2219 | 170 |
| 600 | 630 | 1400 | 1700 | 11 | 2400 | 182 |
| 630 | 630 | 1400 | 1700 | 11 | 2400 | 182 |
| 650 | 680 | 1480 | 1800 | 11.5 | 2930 | 210 |
| 700 | 730 | 1600 | 1900 | 12 | 3593 | 230 |
| 750 | 780 | 1600 | 2000 | 13 | 3800 | 245 |
| 800 | 830 | 1800 | 2000 | 14 | 4800 | 310 |
| 850 | 880 | 1800 | 2200 | 15 | 5140 | 380 |
| 900 | 940 | 2200 | 2500 | 16 | 8180 | 420 |
Structure of Dredge Float
Finished Products
Pipe Floats with Dredge Pipeline for dredging operation
Loading & Transport
Foreign Customers
Main Products
Any query please feel free to




-
Step 1
Payment and order readiness
Minimum order: 20 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
8 days
-
Step 3
Packaging and dispatch
Ocean freight via Maersk · Approx. shipping fee: $ 0.84 for 1 unit · Transit time: Est. 17-24 days
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.