FAQ
Products Description
00:00
Robotic Gantry Waterjet Cutting
• Three inverted industrial robots mounted in an enclosed steel structure cutting box; • High-pressure waterjet nozzles mounted on the 6th axis robotic wrists for collaborative 3D cutting operations (edgetrimming and hole processing); • "SINGLE/FLOW-Through" material handling system with rapid rolling doors on both front and rear sides of the cutting box. Workflow: 1. System preparation and initialization; 2. Operator places workpiece on the vacuum fixture table and activates vacuum adsorption; 3. After confirming secure workpiece fixation, operator exits work area and initiates cycle; 4. Rolling doors close automatically; 5. Three robots perform collaborative cutting operations; 6. Upon completion: • Vacuum system deactivates; • Robots return to PHome position; • Rolling door open; 7. Operator removes finished part and prepares next workpiece; 8. Cycle repeats continuously
The complete system shall primarily consist of
• Industrial Articulated Robot; • Ultra-high Pressure Waterjet Cutting Pump; • Robotic Ultra-High Pressure Waterjet Interface Kit; • Ultra-High Pressure Main Pipeline Assembly; • Enclosed Cutting Chamber with Steel Frame Structure; • Internal Lighting for the Enclosed Cutting Chamber; • Fixed Single Worktable; • Vacuum Cyclone Unit; • Rolling Door; • Electrical Control System; • Safety Protection System; • Fixture ID Coding System, PLUG-IN; • Industrial Chiller; • Water Softener Unit; • Upper Mezzanine of Steel Structure; • Robot Tool Center Point (TCP) Calibration Tool Kit; • Pneumatic Components and Accessories; • Installation Accessories and Components; • Attached Documentation; • Attached Spare Parts and Maintenance Tools; • On-site Installation and Training Services.
Product Description
Q1: Who will pay the postage of the returns?
A: Within the warranty, returning postage happening will be free of charge. (Returns happening outside mainland excluded.)
Q2: How to pay?
A: TT and western Union
Q3: How to pay the deposit?
A: 50% in advance and balance before shipping.
Q4: How to ensure the quality of the products?
A: Every piece of our products will be under strict and repeat tests before delivery.And representative inspector will be
welcomed.
Q5: How will you deliver the products?
A: We can deliver by express, by sea, by air or at you request.
Q6: When will I get my products after delivery?
A: It varies from different places. We will recommend the best and fastest type of shipping for you.
Q7: How is the inventory of your company?
A: We keep a large stock of goods to ensure our prompt delivery.
-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
30 days
-
Step 3
Packaging and dispatch
Ocean freight via Maersk · Approx. shipping fee: $ 0.84 for 1 unit · Transit time: Est. 17-24 days
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.