Fiberglass reinforced plastics gasoline Underground Storage Tank
a. Oil station underground tank material
I nner layer: carbon steel Q235B
outer layer: fiberglass spraying to form a protective layer
b. Oil station underground tank has a uniform mezzanine space with a leak detector which can monitor whether the tank leaks at any time, to prevent pollution risk
Advantage s of Oil station underground tank
1. Economy
Oil station underground tank life is more than 5-10 times compare s with common single-layer steel oil tank, at least 30 years of safe use, significant savings in maintenance costs.
T he leak detector is easy to install that shorten construction time. I t protects the ecological environment of soil and water that eliminates the pollution problem. It saves the high cost of environment protection in latter period.
2.Economical and environment protection.
Fiberglass guarantees the leaks not let out directly to pollute the soil and water.
Not occur electrolytic corrosion with underwater and saline water.
Product Parameter
| Volume(L) | 5000-200000 |
| Size(Dia*length)mm | Can be customized / Under 40000L tank can put into container |
| Material | Carbon Steel |
| Thickness(head*shell)mm | 8 / 6 / 10 / 12 /14 |
| Specification | Double wall |
| Weight(kg) | 9998 |
| Medium | gasoline/petrol/diesel/petroleum/volatile oil |
Production Process
Our own engineers team plays a respectable role for the success high performance Oil station underground tank system.
Our Certification
Our certificate includes ISO9001, special equipment manufacturing license (Class I pressure vessel, Class II low, medium pressure vessel, High pressure vessel, Class III low medium pressure vessel), radiation Safety license, Utility Model Patent Certificate, etc.




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
45 days
-
Step 3
Packaging and dispatch
Ocean + Truck via Maersk · Approx. shipping fee: $ 1,901.11 for 1 set · Transit time: Est. 20-27 days
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.