Skip to Content

Browse

Yingtai Professional Wheat Malting Equipment Malting Service for Malting Companies

Available for enquiry 0.0 · 0 reviews
USD

429,020.00 429020.0 USD 429,020.00

Not Available For Sale

Minimum order quantity: 1 Units

Key attributes

View all
Core components
PLC
Warranty
1 Year
Place of origin
China
Weight (kg)
12000
Use
Process malt.
Heating method
Furnace, Boiler, hot blast heater, etc
Product description

Yingtai Promalting System Variable steeping Vessel for barley malt wheat malt production

Main equipment

1. Barley Receiving and Screening System 2. Barley Steeping System

Process description

The first and most critical stage for malting is steeping. After cleaning and screening, barley is transferred to the malting system. The barley steeping is to increase grain moisture content to a target level suitable for enzymatic activation and germination initiation.

During steeping, barley is subjected to a series of controlled wet and dry cycleswithin a steeping vessel (steep tank). In the wet phases, the grain bed is fully immersed in process water under regulated temperature and aeration conditions to ensure uniform hydration and to prevent anaerobic stress. In the dry phases, also referred to as air rests, the steep water is drained and sterile or conditioned air is introduced to the grain bed to maintain oxygen availability, remove CO2 accumulation, and stabilize respiration activity.

The cyclic alternation between immersion and air rest is typically governed by an automated control system that regulates cycle duration, water level, temperature, and aeration rate. This ensures consistent moisture uptake across the grain batch and minimizes variability in germination performance. The steeping process continues until the barley reaches the required target moisture content, at which point it is discharged for the germination stage of malting.

Generally, the steeping time is approx. 48 hours. After steeping, the barley and water are transported together with a non-blocking pump to the germination process. Promalting can design and manufacture barley steeping tanks to support different malting project from concept to completion, such as craft drum malting system, Saladin malting system, Traditional Saladin malting system. The whole process is fully automatic control.

1. Production structure is compact

2. Short On-site installation time: The

also known as promalting, is a professional supplier only specialized in malting system. It means that “Malting System” is his “Focus” product. Promalting does not just supply malting equipment, but provide comprehensive support-from initial malting project consultation, layout design, test running to installation guidance, and ongoing maintenance.

Promalting can provide a wide array of malting equipments from Barley screening, Barley steeping, Green malt germination and kilning, Ventilation, Storage and Packing. We pride ourselves on using PLC to ensure our clients receive automatic malting system. With more than 30 years' malting experience, our people maintain a strong customer-centric philosophy and passionate about the malting industry and help

Malting Technology Experience

1.Steeping systems 2.Germination systems 3.Kilning systems 4.Ancillary equipment (eg. grain cleaner/pre-screen, deculmer, weighing and bagging machine, chillers,etc) 5.Traditional Saladin malting / Tower Malting: 15000kg-220000kg/batch 6.Germination kilning COMBO Drum 2000Kg-10000Kg/batch 7. Malt Roasting system 200Kg-1000Kg/batch

As a professional malting equipment supplier, we frequently receive emails from clients who want to build a new automatic malt plant. However, some clients are not entirely clear on how to start a new mlathouse project. Below, I listed some questions and answers for you to consider before you begin a malting project and choose the right malting system.

Q1: What is the price of malting system? A: The cost of a malting system will varies based on production capacity and configuration. When you send us the inquiry, pls think about below qusestions and define your production capacity requirements. How many grain do you want to process one year? How many malts do you want to get one batch? How many malts do you want to produce one year? Promalting can supply different malting systems correspond to you production scales.

A: The cost of a malting system will varies based on production capacity and configuration. When you send us the inquiry, pls think about below qusestions and define your production capacity requirements.

Q2: How long can I get one batch of finished malt? A: The complete malting process will include three main steps: steeping, germination, and drying. Normally, it will takes about 6-7 days for you to get one batch of finished malt. If you want to get more finished malt at short days, Promalting can offer expandable malting solution for you.

A: The complete malting process will include three main steps: steeping, germination, and drying. Normally, it will takes about 6-7 days for you to get one batch of finished malt. If you want to get more finished malt at short days, Promalting can offer expandable malting solution for you.

As an increasing number of promalting malting systems running in Europe, Asia, Americas and, more malting plants further production expansion are steadily moving forward. If you are seeking high automatic malting system as an alternative to traditional floor malting or Saladin malting equipment to produce high quality malt for whiskey, beer, or organic food products, Promalting drum craft malting system will be your best choose. You can also find promalting system through the following channels.

Description images
Yingtai Professional Wheat Malting Equipment Malting Service for Malting Companies
Yingtai Professional Wheat Malting Equipment Malting Service for Malting Companies
Yingtai Professional Wheat Malting Equipment Malting Service for Malting Companies
Yingtai Professional Wheat Malting Equipment Malting Service for Malting Companies
Packaging and fulfilment
  • Step 1

    Payment and order readiness

    Minimum order: 1 Units

    Payment terms, specifications, and order details are confirmed before preparation begins.

  • Step 2

    Preparation

    180 days

  • Step 3

    Packaging and dispatch

    Ocean freight via Maersk · Approx. shipping fee: $ 0.84 for 1 unit · Transit time: Est. 17-24 days

    Final packing, freight, and delivery dates are confirmed before dispatch.

Technical specifications
Other details 15 fields
Core components
PLC
Warranty
1 Year
Place of origin
China
Weight (kg)
12000
Use
Process malt.
Heating method
Furnace, Boiler, hot blast heater, etc
Fuel Type
Diesel, Natural Gas, liquefied petroleum gas, etc.
Material
SUS304
Control system
PLC or control cabinet
Features
Modular and scalable
Processing Technology
arley/wheat/grain impregnated, germinated, green malt kiln.
Expandable
Yes
Configuiration
Steep tank, Combo germination and kiln drum, automatic control system
P&ID drawings
yes
Selling Units
Single item
Lead time
180 days
Minimum order
1 Units

Customer reviews

0.0 (0)

No reviews yet

Be the first customer to review this product.

Write a review

Up to 5 JPG, PNG or WebP images; 5 MB each.

Request custom sourcing

Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.

Best-match productsCompetitive quotesFast turnaround
Request custom sourcing

Upload your requirements

Upload your BOM, BOE, RFQ or requirement list and get one consolidated response.

XLS, XLSX, CSV, PDF, DOC or images · Max 10MB each or drag and drop
XLSX
Files are sent securely.