Our wet pan mill for gold recycling is mainly used for separation of gold, silver, lead, zinc, molybdenum, iron, copper, antimony, tungsten, tin and other minerals selected. With less investment, fast results, small footprint saving power, sturdiness and durability, ease of maintenance and high return on investment. It is the preferred production for alternative ball mill, is ideal for small and medium enterprises dressing.
Wet pan mill mainly through the mixing of raw materials, rolling, crushing, rolling repeatedly to reach moisture equilibrium, the ratio of uniform, low gas content, to increase molding and molding quality, grind the material through the machine molding products, It has a high density, strength, and no porosity ratio. Energy efficient, high output, the product is used for iron ore tailings recovery process, not slag the loss, the effective resources can be fully utilized.
Technical details
| Model | Speed r/min | Power (kw) | Process ability( t/h) | Weight(T) |
| 850 | 13-18 | 4.5 | 0.4 | 3 |
| 900 | 13-18 | 5.5 | 0.6 | 3.6 |
| 1000 | 13-18 | 5.5 | 0.8 | 4.2 |
| 1100 | 13-18 | 7.5 | 1 | 4.6 |
| 1200 | 16-18 | 7.5 | 2 | 5.8 |
| 1300 | 16-18 | 11 | 3 | 8 |
| 1350 | 16-18 | 13 | 4 | 8.5 |
| 1400 | 16-18 | 15 | 5 | 9.5 |
| 1500 | 20-22 | 22 | 8 | 10.5 |
| 1600 | 20-22 | 30 | 10 | 16 |
Working Principle
The equipment is mainly composed of power plant,frame,water basin,roller wheel,Nian pan and other components.The use of wheel-driven grinding working mode:First,the motor will drive to the reducer,driven by the reducer,through the large vertical shaft will be passed to the upper horizontal axis,and then installed at both ends of the horizontal rod transmission to the roller wheel,so that the roller to generate driving force,Do counterclockwise rotation along the horizontal axis,while working roller wheel can revolve around the large vertical shaft of the wet mill,and rotate around the center axis of the roller wheel,and the Nian pan is fixed.

-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
25 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.