Whole stamping Centralizer
• Rating-API Specification 10D Standard •Design features – Smooth bow profile overall –Non-welded –Made to gauge – Integral bow design for increased strength and performance – Zero weak points, such as hinges, welds, or mechanical interlocks – Flexible to absorb both axial and radial loading – Powder coated red finish
| Model (in) | Hooping In-Dia. (mm) | Hooping thickness(mm) | Total length (mm) | Max.Out-Di (mm) | Amount of spring (mm) |
| 5-1/2" x 8-1/2" | 142-148 | 3-5 | 650±50 | 225±5 | 5 |
| 7" x 9-5/8" | 181-186 | 3-5 | 650±50 | 255±5 | 6 |
| 7" x 8-1/2" | 181-186 | 3-5 | 650±50 | 235±5 | 6 |
| 8-5/8 x 12-1/4" | 223-228 | 3-5 | 650±50 | 330±5 | 8 |
| 9-5/8 x 12-1/4" | 250-255 | 3-5 | 650±50 | 330±5 | 8 |
| 10-3/4 x 12-1/4" | 274-276 | 3-5 | 650±50 | 330±5 | 9 |
| 13-3/8"x17-1/2" | 342-347 | 3-5 | 650±50 | 450±5 | 11 |
| 18-5/8"x24" | 475-477 | 3-5 | 600±50 | 610±5 | 11 |
| 20"x26" | 509-511 | 3-5 | 600±50 | 660±5 | 12 |
Equipment & technology
2, We have advanced production equipment and testing equipment, ensure the quality of the product
Service
3, stable product quality, supply, the good faith management
Cementing Plug
Mid. Order: 15 Tons more quatities, more cheaper FOB Price: US $ 8.5-8.65/Carton




-
Step 1
Payment and order readiness
Minimum order: 10 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
30 days
-
Step 3
Packaging and dispatch
Approx. shipping fee: $ 312,505.00 for 10 pieces · Fastest delivery: Nov 25 (71 days)
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.