Skip to Content

Browse

Specializing in the Production Assembly of Oil Mining Equipment Parts Complete Equipment Manufacturer for Petroleum Processing

Available for enquiry 0.0 · 0 reviews
USD

210.00 210.0 USD 210.00

Not Available For Sale

Minimum order quantity: 2 Units

Key attributes

View all
Annual remaining processing capacity
2000
Processing customization
yes
Prototype cycle
1-3 days
Processing method
Processing with supplied materials and labor
Part number
02
Processing cycle
4-7 days
Product description

Warm reminder for the production and assembly of oil and mining equipment parts by the entire set of equipment manufacturers: The material specifications of

Part Number02
Maximum annual processing capacity5000
Welding processArgon arc welding
Processing cycle4-7 days
Processing methodProcessing with supplied materials and labor
Prototype cycle1-3 days
Application areas of machined partsSeamless aluminum tube
Processing customizationyes
Annual remaining processing capacity2000
Machinable materialsaluminum
Energy sourceGas Flame
Company Name
Company AddressRoom S116, 2/F., The Capital, 61-65 Chatham Road South, Tsim Sha Tsui, Kowloon
Company CountryHK
Description images
Specializing in the Production Assembly of Oil Mining Equipment Parts Complete Equipment Manufacturer for Petroleum Processing
Specializing in the Production Assembly of Oil Mining Equipment Parts Complete Equipment Manufacturer for Petroleum Processing
Specializing in the Production Assembly of Oil Mining Equipment Parts Complete Equipment Manufacturer for Petroleum Processing
Specializing in the Production Assembly of Oil Mining Equipment Parts Complete Equipment Manufacturer for Petroleum Processing
Packaging and fulfilment
  • Step 1

    Payment and order readiness

    Minimum order: 2 Units

    Payment terms, specifications, and order details are confirmed before preparation begins.

  • Step 2

    Preparation

    Lead time will be confirmed with your quotation.

  • Step 3

    Packaging and dispatch

    Packaging details are available on request.

    Final packing, freight, and delivery dates are confirmed before dispatch.

Technical specifications
Other details 11 fields
Annual remaining processing capacity
2000
Processing customization
yes
Prototype cycle
1-3 days
Processing method
Processing with supplied materials and labor
Part number
02
Processing cycle
4-7 days
Maximum annual processing capacity
5000
Machinable materials
aluminum
Application areas of machined parts
Seamless aluminum tube
Welding process
Argon arc welding
Selling Units
Single item
Minimum order
2 Units

Customer reviews

0.0 (0)

No reviews yet

Be the first customer to review this product.

Write a review

Up to 5 JPG, PNG or WebP images; 5 MB each.

Request custom sourcing

Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.

Best-match productsCompetitive quotesFast turnaround
Request custom sourcing

Upload your requirements

Upload your BOM, BOE, RFQ or requirement list and get one consolidated response.

XLS, XLSX, CSV, PDF, DOC or images · Max 10MB each or drag and drop
XLSX
Files are sent securely.