1. Grade: SUS201,SUS304,SUS316,A2-70,A2-80,A4-80,4.8 6.8 8.8 10.9 12.9
2. Size: M3-48
3. Standard: DIN 315
4. Certification: ISO9001, SGS, CTI, ROHS
| Product Name | Best Cast iron valve for construction fastener |
| Material | Cast Iron |
| Color | Epoxy coating in blue |
| Standard | DIN GB ISO JIS BA ANSI |
| Grade | CI,SUS201, SUS304, SUS316, A2-70, A2-80, A4-80, 4.8 6.8 8.8 10.9 12.9 |
| Brade | Rock |
| Flange | coarse, fine |
| Used | building industry machinery Factory |
High quality
Passed the ISO9001:2008 quality system authentication and ROHS authentication.
Workshop
Our Workshop
Warehouse
Our Warehouse
Team
Packing Details: Packing, solid bicycle saddle, 50pcs/carton
Delivery Details: 3-30 days after order of Solid bicycle tire tubes
Best stainless
Best stainless steel wing nut anchor bolt for construction fastener bags+cartons+pallets according to customer ' s requirement,Best stainless steel wing nut anchor bolt for construction fastener bags+cartons+pallets according to customer ' s requirement
Favorable Comment
Best stainless steel wing nut anchor bolt for construction fastener bags+cartons+pallets according to customer ' s requirement,Best stainless steel wing nut anchor bolt for construction fastener bags+cartons.
Q
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples? is it free or extra?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance,balance before shippment. If you have another question, pls feel free to




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
15 days
-
Step 3
Packaging and dispatch
Ocean freight via Maersk · Approx. shipping fee: $ 0.84 for 1 unit · Transit time: Est. 17-24 days
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.