2. The weighting hopper can be combined with a pump or be used independently with pump connected together by manifold valve.
3. Put the drilling fluids materials ( bentonites, barite powder ) and the corresponding chemical additives
( polymer ) into circulation tank for increasing the total.
| Model | SLH150-50 | SLH150-40 | SLH150-35 | SLH100-25 |
| Matching Pump | SB8×6-13J(55Kw) | SB6×5-13J(45Kw) | SB5×4-13J(30Kw) | SB4×3-11J(15Kw) |
| Capacity | 240m³/h | 180m³/h | 120m³/h | 60m³/h |
| Pressure | 0.25~0.40Mpa | 0.25~0.40Mpa | 0.25~0.40Mpa | 0.25~0.40Mpa |
| Inlet Size | 150mm | 150mm | 150mm | 100mm |
| Nozzle Size | 50mm | 40mm | 35mm | 25mm |
| Hopper Diameter | 750×750mm | 750×750mm | 600×600mm | 500×500mm |
| Burden Speed | ≤100Kg/min | ≤80Kg/min | ≤60Kg/min | ≤40Kg/min |
| density | ≤2.8g/cm³ | 2.4g/cm³ | ≤2.0g/cm³ | ≤1.5g/cm³ |
| viscosity | ≤120s | ≤120s | ≤80s | ≤60s |
Lake Petro is located in City, which is famous for Shengli Oilfield and the largest manufacturing hub of petroleum equipment. Following the principle of “quality first, science and technology innovated, people oriented”, every Lake Petro person is sparing no effort to provide the customers with best products and services. Our products are based on advanced




-
Step 1
Payment and order readiness
Minimum order: 5 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
40 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.