Skip to Content

Browse

Mineral Separator Lead Zinc Copper Mine Processing Equipment Plant Machine

Available for enquiry 0.0 · 0 reviews
USD

350,370.00 350370.0 USD 350,370.00

Not Available For Sale

Minimum order quantity: 1 Units

Key attributes

View all
Type
Flotation Separator
Voltage
as per your country condition
Core components
Bearing, PLC, Motor, Pressure Vessel, Gear, Engine, Pump, Gearbox
Machinery test report
Provided
Warranty
One year, one year except wearing parts
Video outgoing-inspection
Provided
Product description

Recenlty Our client case

We have set up 1200TPD gold ore CIL plant

3000TPD iron ore

300TPD and 1500TPD copper ore processing line

300TPH sand iron ore processing line

500TPD copper ore processing line

600TPD silver ore processing line

750TPD graphite ore processing line

250TPD copper ore processing line

100TPD graphite ore processing line

25TPD Lab graphite ore processing line

30TPD lab copper ore processing line

25TPD Lab copper ore processing line

400TPD copper cobalt ore processing line

Small mining equipment,,,, Zimbabwa,,,,,,, Philippline etc

We have different capacity beneficiation plant at home and abroad

If you interesting in our beneficiation equipments, pls fell free to contact me, and inform us the following details

1. the max feeding size

2. the capacity per hour or day

3.the ore grade

4. your other demand

Mineral processing equipment introduction

This lead zinc Ore beneficiation and upgrading line is very practical for small and middle mine owner to upgrading the ore grade.

Basic Process of lead zinc ore beneficiation and upgrading plant

1) The ore is first sent to the jaw crusher for primary crushing.

2) Then the ore with a proper size for secondary crushing fine crusher, or cone crusher to get the <25mm site, then through betlt conveyor will be sent into the ball mill for fine crushing and grinding.

For big capacity, in order to save energy, the ball mill feeding size will be reach <12mm, we use three stage crushing, such as Jaw crusher · fine crusher · vibraring screen · cone cusher · vibrating screen or Jaw crusher · vibraring screen · cone crusher · cone crusher · vibrating screen

3) The fineness powder discharged from the ball mill will be flow into the next procedure: classifying., the ball mill and classfier will be form a closed circuit, the big size will go to ball mill for regrinding.

4) Because of the different sedimentation rate due to the varied specific gravity, spiral classifier can clean and group the ore mixture. Sometimes, we also use will hydro cyclone instead of spiral classifier.

5) Then the mixture is sent to mixer, we will add chemical here and flow into flotation machine. According to the features of different ores, we can add different additive into the mixture to separate the ore which we want from the mixture.

We will first separate lead or zinc concentrate first then separate the left one.

6) After the seperation from the mixture, the ore we want always contains a lot of water, then we need a thickner to have it concentrated and then filter and dried by a drier, enventually we can get dry concentrate ore.

General process

♦ Primary crushing ( Jaw crusher )

♦ Secondary crushing ( Fine jaw crusher )

♦ Screening ( Vibrating screen )

♦ Third crushing ( Fine jaw crusher ) or ( Cone crusher)

♦ Grinding ( wet Ball mill )

♦ Classifying ( Sprial classifier or hydro cyclone or High frequency vibrating screen )

♦ Ore separating ( Flotation machine/ Magnetic seperator/ Shaking table )

♦ Concentrating ( Concentrator )

♦ Drying ( thickener, filter, Rotary dryer )

100TPD lead zinc ore ball mill

300TPD Lead zinc ore Primary jaw crusher and Fine jaw crusher

300TPD Lead zinc ore ball mill 2100x3600

Agitation tank XB 2500

Flotation machine XCF-KYF-4

Concentrate separate flotation machine SF-2.8

600TPD lead zinc ore Ball mill

Our services

1. Ore laboratory test

2. Ore beneficiation test

3. Flowchart designing and layout designing.

4. Full set of machines

5. Erecting and commissioning

6. Training

7. Technical consolation

8. End products selling

In a world, we can do EPC for you,for the mineral processing experiment to the final product produced, we can send one team work in charge of the plant operation.

If you want more information about mining equipment,please refer to http:machinexy.en.

Customer using site photos

200tpd lead zinc ore customer using site

500TPD lead zinc ore processing line

1. Which kind of raw material and the feeding size?

2. The capacity per day

3. The raw ore specific content and percent? (You had better send us analysis report)

4. The grade you want to get

Description images
Mineral Separator Lead Zinc Copper Mine Processing Equipment Plant Machine
Mineral Separator Lead Zinc Copper Mine Processing Equipment Plant Machine
Mineral Separator Lead Zinc Copper Mine Processing Equipment Plant Machine
Mineral Separator Lead Zinc Copper Mine Processing Equipment Plant Machine
Packaging and fulfilment
  • Step 1

    Payment and order readiness

    Minimum order: 1 Units

    Payment terms, specifications, and order details are confirmed before preparation begins.

  • Step 2

    Preparation

    40 days

  • Step 3

    Packaging and dispatch

    Packaging details are available on request.

    Final packing, freight, and delivery dates are confirmed before dispatch.

Technical specifications
Other details 24 fields
Type
Flotation Separator
Voltage
as per your country condition
Core components
Bearing, PLC, Motor, Pressure Vessel, Gear, Engine, Pump, Gearbox
Machinery test report
Provided
Warranty
One year, one year except wearing parts
Video outgoing-inspection
Provided
Key selling points
Energy Saving
Production Capacity
above 90%
Place of origin
China, Henan
Weight
185000 KG
Material
Q235, ZGMn13
Color
decide by you
Installation
Guide by our engineer
Spare Parts
supply by us
Certificate
ISO9001:2008
Application
Iron Ore, Magnetite iron oree
Design
reasonable
Price
competitive and reasonable
Capacity
12-3000TPD
Selling Units
Single item
Single package size
119X225X210 cm
Single gross weight
28000.0 kg
Model number
lead zinc ore processing line
Power (W) (Product option)
Up to the capacity
Lead time
40 days
Minimum order
1 Units

Customer reviews

0.0 (0)

No reviews yet

Be the first customer to review this product.

Write a review

Up to 5 JPG, PNG or WebP images; 5 MB each.

Request custom sourcing

Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.

Best-match productsCompetitive quotesFast turnaround
Request custom sourcing

Upload your requirements

Upload your BOM, BOE, RFQ or requirement list and get one consolidated response.

XLS, XLSX, CSV, PDF, DOC or images · Max 10MB each or drag and drop
XLSX
Files are sent securely.