1.PVC tank and duralumin body resistant to corrosion.
2. Extra-long developing with stable uniformity, especially adaptive to high-speed photosensitization thermal or UV CTP plates.
3. Overdeveloping gum roller assures no damage to the surface and two sets of wash brushes assures sufficient development.
4. Independent develop cooling system keeps the develop temperature fluctuation within 0.5 dgree Celcius.
5. Accurate automatic anti-oxidation detecting and replenishing system of CTP plate processor controls developing concentration.
6. Automatic cleaning and recycling.
7. Precise PLC control, processing without any letup.
8. Energy saving and environment friendly.
Technical Specification
| Model | SL—88H | SL—120H | SL—140H |
| Material | Thermal CTP plate | ||
| Capacity (cm/min) | 20—150 | ||
| Plate width (mm) | 850mm | 1150mm | 1350mm |
| Min. Plate length(mm) | 30 0 | ||
| Plate thickness(mm) | 0.15—0.4 | ||
| Tank content, developer(L) | 38 | 56 | 68 |
| Tank content, wash(L) | 13.5 | 18 | 20 |
| Adjustable temperature, dev(°C) | 0—40(104°F) 0 to 40°C adjustable (32—104°F) | ||
| Adjustable temperature, dry(°C) | |||
| Water consumption, max (L/min) | 8 | 10.5 | 12 |
| Diameter of wash brush (mm) | 50 | ||
| Rotary speed of wash brush | 80 | ||
| Filter(um) | 75 | ||
| Water supply | Tap water (min. pressure 1 bar) | ||
| Gumming | Roller pressing gumming | ||
| Diameter of roller | 60mm | ||
| Dev. replenishment | 0—1 | ||
| Dev. heating-up rate | 0.5 | ||
| Horizontal adjustment | Adjustable | ||
| Power supply | 220V 1φ 50—60Hz 30A | ||
| Power consumption (kw/h) | 3.5 | 4 | 4.5 |
| Voltage fluctuation | ±10% | ||
| Gross weight(kg) | 500 | 650 | 780 |
| Net weight(kg) | 420 | 580 | 650 |
| Mechanic size(mm) | 1260*1520*1040 | 1525*1520*1040 | 1850*1555*1040 |
| Packing size(mm) | 1360*1620*1250 | 1625*1620*1250 | 1950*1655*1250 |
| Optional configuration:plate stack.water filtration system |
CTP Processor on APPP EXPO
July 3rd to 7th, 2014 APPP EXPO in Shanghai, CTP Processor is exhibited with Amsky CTP




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
15 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.