YTC Valve Positioner YT-1000R - Standard Type (Single Acting, Rotary) Product Dimensions YTC Valve Positioner YT-1000R - Standard Type (Single Acting, Rotary) product dimensions, weight, parameters, installation method, and measurement medium introduction ⚙️ Core Parameters The YT-1000R receives a 4-20mA DC electrical signal from the control system and converts it into a pneumatic signal to precisely control the rotational angle (typically 0-90°) of the rotary pneumatic actuator. Table Parameter Item Parameter Value Notes Model YT-1000R (Rotary Type) R stands for rotary Input Signal 4 ~ 20mA DC Standard control signal Supply Pressure 1.4 ~ 7 kgf/cm² (20 ~ 100 psi) Normal operating pressure range Stroke Range 0 ~ 90° Suitable for rotary actuators Linearity ±1% (Single Acting) High control accuracy Sensitivity ±0.2% (Single Acting) Responsive Air Consumption 3 LPM (at 1.4kgf/cm² pressure) Low air consumption Tubing Connection PT or NPT 1/4 Inlet/Outlet size Electrical Connection PF 1/2 (G 1/2) Power and signal wiring connection Protection Rating IP66 Dust and water-resistant, suitable for harsh environments Ambient Temperature -20℃ ~ 70℃ Wide temperature range operation Material Die-cast aluminum Compact, sturdy, and durable Product Dimensions and Weight Dimensions: The product is designed with a compact structure using precision die-casting. The external dimensions of the rotary model are approximately 221 × 166.5 × 113.5 mm (L×W×H). Weight: Approximately 2.8 kg. Installation Method The YT-1000R is a rotary positioner, and its installation focuses on the correct setup of the cam and feedback shaft. The main steps are as follows: Install the Positioner: Fix the positioner to the rotary actuator using a bracket, ensuring that the positioner's main shaft is concentric with the actuator's main shaft. Connect the Feedback Shaft: Connect the positioner's feedback shaft to the actuator's main shaft, ensuring a secure and tight connection. Cam Installation: This is a critical step. Choose the cam installation face (DA face or RA face) based on the actuator's direction of motion (clockwise or counterclockwise rotation). DA (Direct Acting): When the input signal increases, the actuator shaft rotates clockwise. RA (Reverse Acting): When the input signal increases, the actuator shaft rotates counterclockwise. Zero Point Calibration: With a 4mA input signal, loosen the cam's locking nut, rotate the cam to align its zero point scale with the bearing contact point, then tighten the nut. Span Adjustment: Input a 20mA signal and check if the actuator has rotated to 90°. If the stroke is too large or too small, make fine adjustments using the span adjustment knob. Repeated Calibration: After span adjustment, recheck the zero point, and repeatedly adjust the zero point and span until both meet the requirements. The positioner comes with mounting plates and accessories that match various types of actuators, making installation and adjustment relatively easy. ️ Measurement Medium Medium Type: The product itself does not directly measure the fluid medium in the pipeline. It receives an electrical signal and uses clean compressed air as the power source (working medium) to drive the rotary pneumatic actuator, thereby indirectly controlling the opening of valves (such as butterfly valves, ball valves). Air Source Requirements: The supplied air must be purified, removing moisture and dust, to maintain stable operation of the positioner.
| Origin | |
| Driven energy | electric actuator |
| Part Number | 45779267 |
| brand | YTC |
| model | YT-1000 YT-1000R YT-1000L |
| Specification | YT-1000R |
| Processing customization | no |
| Whether it is a dedicated source of goods for cross-border export | no |
| Product Uses | electric |
| Imported or not | no |
| Order Number | 45545674 |
| Specification | YT-1000R |
| Company Name | CRISOVA NON-SPECIALIZED WHOLESALE TRADING |
| Company Address | UNIT 1218 12/F GOLDMINE TOWER 730 P. OCAMPO ST. ZONE 78 BARANGAY 719 1004 MALATE NCR, FIRST DISTRICT |
| Company Country | PH |




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
Lead time will be confirmed with your quotation.
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.