Brief Introduction
API 11E Pumping Unit is beam balanced units.These units fill the need of economically producing many of the shallow wells. It's a common type of suker rod pumpiing surface unit.
Carrier Bar
Description
Body,Baffile,Lock,block,Rivet,Bolt,Sleeve,Nut
Introduction: Carrier bar is used to connect polished rod, wire line and polish rod clips,high strength stability.
Wire Line
Description: Carrier Bar
Introduction: The wire line is made of multiplayer, nontorsional steel wire. With enough strength, complied with API 11E Specifications.
Head
Description: Horse head
Introduction: Horse head is welded with steel plate. Wire line is hung in the horse head rope supplort. The horse head connect to front of the walking beam.
Walking Beam
Description: Walking Beam,Bolt,Nut,Center bearing assembly,Beariing Cover,Beam Counter Weights
Introduction: Walking beam is welded with steel plate. The front end of walking beam connect with horse-head through horse-head pin, and connect with equalizer at the rear. Whole walkiing beam is fixed on the center bearing.
Belt Guard
Description: Side fence,Front fencs,Bolt,Oblique gaskets, Washer,Spring Washer,Nut.
Introduction: Belt guard is the safety guard facility of the pumping unit. It is made of solid plate and bolted to the pumping unit's base assembly and the gear reducer.
Pumping Unit Main Technical Parameters
| Packaging | |
| Name | Parts/Tools/Files |
| Method | Iron BOx |
| Packaging Details | Pumpiing units small parts,tools and files(Operation Manual,Parts Catalog) in to the Iron box,then with the Main Machine in to the container |
| Packaging | |
| Name | Main Machine |
| Method | Naked |
| Packaging Details | After fixed, Pumping units main machine naked into the container. |
Iron Box
Parts,Tools, Files
Fixed
Fixed and ready to delivery
Loading
Crane to assist in loading.
Loading Finished
All the part into the container
Container is transported to the port
Container loaded on board, travel across the sea to the port of destination.




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
45 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.